My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.3 SR 10-17-2022
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2022
>
10-17-2022
>
4.3 SR 10-17-2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2022 8:12:24 AM
Creation date
10/13/2022 2:49:25 PM
Metadata
Fields
Template:
City Government
type
SR
date
10/17/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHANGE LOG <br />PR <br />PR NO. <br />RFI <br />RFI NO. <br />CDR <br />DATE CDR NO. <br />DESCRIPTION OF CHANGE <br />CHANGE STATUS <br />APPROVED <br />CDR STATUS CCHARGE TOY OPEN CDR COR'S: CO AIA CO BIC COMMENTS ON STATUS <br />ONTINGENC AMOUNT AMOUNT NO. <br />SUB STATUS <br />CO SENT TO SUB <br />2/18/2021 <br />35 <br />PD - Custom Powder Coat Finish - High Speed Doors <br />Approved <br />$2,310.00 <br />Yes <br />78 <br />3/10/2021 <br />36 <br />PD - North Wall Brick Veneer Removal <br />Approved <br />$12,809.00 <br />Yes <br />3/1/2021 <br />37 <br />PD - 2nd Level Window Sill <br />Approved <br />$455.00 <br />1 <br />AIA C0#1 <br />Yes <br />12 <br />3/1/2021 <br />38 <br />PD - Heat Pump Circuiting <br />Approved <br />$2,282.00 <br />Yes <br />73 <br />3/8/2021 <br />39 <br />ASI 13 - SOG Clarifications <br />Approved <br />$4,527.51 <br />Yes <br />14R <br />3/5/2021 <br />40R <br />PD - Cast -In -Place and Delineator Bollards <br />Approved <br />$638.66 <br />Yes <br />62 <br />3/8/2021 <br />41 <br />FD/PD - Mechanical Roof Penetrations <br />Approved <br />$1,704.00 <br />Yes <br />63 <br />3/5/2021 <br />42 <br />ASI 12- Door Operator Motors <br />Approved <br />$1,992.00 <br />Yes <br />75 <br />3/8/2021 <br />43 <br />FD - Irrigation Line Extension <br />Approved <br />$2,494.82 <br />Yes <br />3/8/2021 <br />44R <br />PD - 2nd Level Casework & Counter Modifications <br />Approved <br />$3,769.42 <br />Revised Granite Pricing <br />Yes <br />16 <br />79 <br />4/8/2021 <br />45 <br />FD - Custom SK-2 and Tempered Water <br />Approved <br />$1,514.79 <br />Yes <br />10 <br />3/10/2021 <br />46 <br />PD - Out of Sequence Storm Sewer Install <br />Approved <br />$2,800.00 <br />1 <br />AIA C0#1 <br />Yes <br />93 <br />3/11/2021 <br />47 <br />FD - Split Face Block Size at Trash Enclosure <br />Approved <br />($1,040.00) <br />Yes <br />82 <br />3/18/2021 <br />48 <br />FD - Structural Apron Extension at Door 101BX <br />Approved <br />$496.74 <br />Yes <br />15 <br />3/18/2021 <br />49 <br />PD - Gate Operator Circuiting <br />Approved <br />$178.00 <br />Yes <br />13 <br />3/18/2021 <br />50 <br />FD - Roof Drainage Storm Sewer Modifications <br />Approved <br />$5,560.00 <br />Yes <br />3/26/2021 <br />51 <br />FD - Construction Access Class 5 - T&M <br />Approved <br />$1,345.00 <br />Yes <br />103 <br />3/24/2021 <br />52 <br />FD - 2" Truck Fills App Bays West <br />Approved <br />$4,489.52 <br />Yes <br />88 <br />3/26/2021 <br />53 <br />PD - Existing SOG Moisture Mitigation SWAT 171 <br />Approved <br />$704.00 <br />1 <br />AIA C0#1 <br />Yes <br />3/30/2021 <br />54 <br />PD - Cut Bolts & Patch CMU Detail 20/5301 - T&M <br />Approved <br />$691.00 <br />Yes <br />100 <br />3/30/2021 <br />55 <br />FD - App Bay East OH Doors - Surface Mount Electrical <br />Approved <br />$527.00 <br />Yes <br />91 <br />3/30/2021 <br />56 <br />FD - Air Drops Above Trucks <br />Approved <br />$954.03 <br />Yes <br />95 <br />3/31/2021 <br />57 <br />FD - Alternate Gas Pipe Routing <br />Approved <br />($538.15) <br />Yes <br />108 <br />5/12/2021 <br />58R <br />FD - EIFS Unforeseen West Elevation <br />Approved <br />$1,385.00 <br />Revised Pricing <br />Yes <br />76 <br />4/5/2021 <br />59 <br />FD - Brick Ledge Removal at GL A <br />Approved <br />$182.00 <br />Yes <br />4/5/2021 <br />60 <br />FD - ITT Damaged Storm Pipe: Compaction Testing <br />Approved <br />$113.06 <br />1 <br />AIA C0#1 <br />Yes <br />109 <br />4/6/2021 <br />61 <br />PD - Adjust Door 176B Frame Depth <br />Approved <br />$513.58 <br />Yes <br />117 <br />4/12/2021 <br />62 <br />FD - Storefront S.1 Interior Aluminum Trim (Head & Jambs) <br />Approved <br />$1,310.00 <br />Yes <br />97 <br />4/13/2021 <br />63 <br />PD - Revised Structural Note G at P/1 and P/3 <br />Approved <br />$1,776.00 <br />Yes <br />17 <br />4/30/2021 <br />64R <br />FD - Fur/Frame App Bay Walls & Jamb Steel Plates <br />Approved <br />$10,777.63 <br />Framing Work Completed - CO Sent <br />Yes <br />4/15/2021 <br />65 <br />PD - 2nd Level: Virnig T&M - Unforeseen Conditions <br />Approved <br />$2,355.00 <br />1 <br />AIA C0#1 <br />Yes <br />72 <br />4/15/2021 <br />66 <br />PD - Plumbing Demo <br />Approved <br />$1,762.72 <br />Yes <br />105 <br />4/16/2021 <br />67 <br />FD - Illuminated Sign Power - ASI 14R <br />Approved <br />$2,010.00 <br />Yes <br />21 <br />4/19/2021 <br />68 <br />PD - Masonry Lintel Changes - Attachment 8 (Door 176B) <br />Approved <br />($101.00) <br />Yes <br />118 <br />4/20/2021 <br />69 <br />PD - Overflow Routing Existing PD Garage <br />Approved <br />($1,632.33) <br />Yes <br />116 <br />4/223/21 <br />70R <br />PD - Alt. Site Fence Piers at Geothermal Lines <br />Approved <br />$1,628.98 <br />Revising Pricing Based on Site Conditions <br />Yes <br />92 <br />4/23/2021 <br />71 <br />PD - Lowering Existing Flammable Waste Interceptor <br />Approved <br />$8,595.42 <br />Yes <br />107 <br />6/7/2021 <br />72 <br />PD - Garage Loops to Sensors <br />Approved <br />($1.70) <br />CO Not Sent to Klein <br />Yes <br />18 <br />5/3/2021 <br />73 <br />PD/FD - VFDs <br />Approved <br />$3,570.34 <br />Yes <br />123 <br />5/3/2021 <br />74 <br />PD - Alternate Supply Air Routing - 1st Level Reno <br />Approved <br />1 ($227.41) <br />Yes <br />120 <br />5/3/2021 <br />75 <br />FD - Alternate Sign Type <br />Approved <br />$1,825.95 <br />Yes <br />21 <br />5/6/2021 <br />76R <br />PD - Boiler Drain Condensate Lines: Pump to Geothermal <br />Approved <br />$1,891.50 <br />$864.35 - Drain Through Exterior Wall <br />Yes <br />20 <br />113 <br />5/4/2021 <br />77 <br />PD - Site Work Bird Ponding <br />Approved <br />$11,104.65 <br />Yes <br />22 <br />5/28/2021 <br />78R <br />FD/PD - App Bay Lights & Gate Stop/Go Light <br />Approved <br />$5,168.00 <br />Revised to F&I Stop/Go Light <br />Yes <br />5/18/2021 <br />79 <br />1 PD - Duty Bag Walk Off Mat <br />Approved <br />$2,943.44 <br />Yes <br />Construction Change Order Log 10232018 Page 2 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.