Laserfiche WebLink
An Terra <br />CTION <br />21025 Commerce Blvd, Suite 1000 <br />Rogers, MN 55374 <br />763.463.0220 <br />Date: 10/6/2022 <br />Project: Elk River Public Safety Building Expansion <br />Change Order Log <br />PR RFI <br />PR NO. RFI NO. <br />20 <br />—4� <br />CDR <br />DATE CDR NO. <br />2/12/2021 1 <br />DESCRIPTION OF CHANGE <br />ASI 1 - Civil and Mechanical Changes <br />CHANGE LOG <br />CHANGE STATUS <br />CDR STATUS CCHARGE TOY OPEN CDR APPROVED AIA C <br />ONTINGENC AMOUNT COR'S: CO 0 BIC COMMENTS ON STATUS <br />AMOUNT NO. <br />Approved $19,711.13 Revised ADA Parking & Full Depth <br />SUB STATUS <br />CO SENT TO SUB <br />Yes <br />19 <br />12/7/2020 <br />2 <br />Electric Water Coolers - Space Requirements <br />Approved <br />($5,017.00) <br />Yes <br />12/7/2020 <br />3 <br />Add to Expedite PD Upper Level HMF's <br />Approved <br />$1,294.50 <br />Yes <br />1 R <br />15 <br />2/12/2021 <br />4R2 <br />AL Windows, Storefront, Curtain Walls, and Foundation Changes <br />Approved <br />$18,918.54 <br />No cost associated w/ bollard footing changes <br />Yes <br />21 <br />1/15/2021 <br />5R <br />FD/PD - Masonry Lintel Changes <br />Approved <br />$193.74 <br />Yes <br />5 <br />12/15/2020 <br />6 <br />FD - Apron detail at existing OH doors <br />Approved <br />$3,150.08 <br />Yes <br />37 <br />12/21/2020 <br />7 <br />ASI 5 - Men's Restroom 220 Toilet Partition <br />Approved <br />$1,816.28 <br />Yes <br />12/22/2020 <br />8 <br />Electrical Supplemental Heat RI - PD Upper Level <br />Approved <br />$5,387.00 <br />Yes <br />1/27/2021 <br />9R <br />HSCD - VE Option 1 (Hormann SG5000) <br />Approved <br />($6,100.00) <br />Yes <br />12/22/2020 <br />10R <br />HSCD - VE Option 2 (Hormann SR9000) <br />VOID <br />12 <br />12/28/2020 <br />11 <br />FD - Trench Drain Isolation Joint & SOG Elevation <br />Approved <br />$1,480.00 <br />Yes <br />5 <br />27 <br />12/29/2020 <br />12R <br />ACT Changes and Deletion of Insulation at Vertical Foundation Walls <br />Approved <br />$5,685.94 <br />ACT-1 & ACT-2 to USG Astro <br />Yes <br />3R <br />11 <br />1/5/2021 <br />13 <br />FD - Trench Drain at room 109 "Equipment Decon" <br />Approved <br />$735.88 <br />Yes <br />2R <br />24/28 <br />1/5/2021 <br />14 <br />Roof Drain at Existing PD Garage <br />Approved <br />$24,931.50 <br />1 <br />AIA CO <br />Yes <br />17 <br />1/15/2021 <br />15 <br />Added EIFS demo and paint prep per RFI 17. <br />Approved <br />$1,164.00 <br />Yes <br />41 <br />1/15/2021 <br />16 <br />Added Bond Beam at GL 0 A per RFI 41 <br />Approved <br />$2,320.00 <br />Yes <br />1/12/2021 <br />17 <br />ASI#6 - Re -Circuiting HVLS Fans and Upsize LP2 Panel <br />Approved <br />$773.00 <br />Yes <br />4R <br />1/21/2021 <br />18R <br />FD - Pressure Washer <br />Approved <br />$2,267.00 <br />Yes <br />1/26/2021 <br />19 <br />ASI #2 - PD 2nd Level Tile Changes <br />Approved <br />$7,472.00 <br />Yes <br />6R <br />1/15/2021 <br />20 <br />Mechanical Equipment/Electrical Changes <br />Approved <br />($1,050.00) <br />Yes <br />7 <br />1/26/2021 <br />21 <br />Heat Exchangers and Pumps <br />Approved <br />$9,337.00 <br />Yes <br />9 <br />1/22/2021 <br />22 <br />FD - Decon Vest. Sink Change (SK-1) <br />Approved <br />$1,923.23 <br />Yes <br />45 <br />1/22/2021 <br />23 <br />FD - Mop Sink SS-2 Changes <br />VOID <br />1/22/2021 <br />24 <br />ASI 08 - Overflow Relocation at Fire Department <br />Approved <br />$3,662.69 <br />Yes <br />8 <br />1/29/2021 <br />25 <br />Eliminate Fabrication of New Removable Mezzanine Railing Section <br />Approved <br />($2,238.86) <br />Yes <br />36 <br />2/23/2021 <br />26 <br />New Mechanical Louver Opening per RFI 36. <br />Approved <br />$6,167.95 <br />Yes <br />1/25/2021 <br />27 <br />Under Cabinet Light- Kitchenette 212 and Corridor 213 Nook <br />Approved <br />$965.00 <br />Yes <br />11 <br />1/28/2021 <br />28 <br />Electrical Updates (PD 2nd Level Exit Lights) <br />Approved <br />$713.00 <br />Yes <br />2/17/2021 <br />29 <br />ASI 02R - Solid Surface Changes and Carpet Deduct. <br />Approved <br />($1,129.86) <br />Yes <br />2/1/2021 <br />30 <br />PD 2nd Level Window Shade upgrade and WG-1 Elimination. <br />Approved <br />$2,463.19 <br />Yes <br />2/23/2021 <br />31 <br />RE BID Reconciliation (Casework, Flooring, Fencing) <br />Approved <br />($29,971.50) <br />N/A <br />2/23/2021 <br />32 <br />PD 2nd Level - Existing Electrical Demo <br />Approved <br />$380.00 <br />Yes <br />59 <br />2/15/2021 <br />33 <br />FD - Parapet Vapor Barrier in lieu of Air Barrier per RFI 59 <br />Approved <br />($118.74) <br />Yes <br />1 R <br />2/15/2021 <br />34 <br />1 PD - Bollard Footing Changes <br />VOID <br />Construction Change Order Log 10232018 Page 1 of 5 <br />