My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.3 SR 10-17-2022
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2022
>
10-17-2022
>
4.3 SR 10-17-2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2022 8:12:24 AM
Creation date
10/13/2022 2:49:25 PM
Metadata
Fields
Template:
City Government
type
SR
date
10/17/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PR RFI CDR <br />PR NO. RFI NO. DATE CDR NO. <br />CHANGE LOG <br />CHANGE STATUS <br />DESCRIPTION OF CHANGE CDR STATUS CCHARGE TOY OPEN CDR APPROVED AIA C BIC COMMENTS ON STATUS <br />AMOUNT <br />SUB STATUS <br />CO SENT TO SUB <br />124/131 <br />5/14/2021 <br />80 <br />PD - Top of CMU Wall and Joist Pockets <br />Approved <br />$1,395.48 <br />Yes <br />19 <br />6/11/2021 <br />81 R2 <br />FD - Fire Station #2 Office Remodel <br />Approved <br />$62,619.63 <br />1 <br />AIA C0#1 <br />N/A <br />125 <br />5/18/2021 <br />82 <br />PD - Gate Card Reader Pedestal Footings <br />Approved <br />$1,245.32 <br />Yes <br />5/24/2021 <br />83 <br />PD - ASI 16 Low Voltage Sleeves <br />Approved <br />$312.00 <br />Yes <br />132 <br />5/24/2021 <br />84 <br />PD - Roll Call 165 Electrical North Wall <br />Approved <br />$466.00 <br />Yes <br />130 <br />6/2/2021 <br />85 <br />PD - Site Fence Pier Height <br />Approved <br />$7,186.00 <br />Yes <br />6/3/2021 <br />86 <br />FD - App Bay 208V Single Phase Garage Doors <br />Approved <br />($1,992.00) <br />Eliminates added cost per COR 42 <br />Yes <br />23 <br />6/8/2021 <br />87 <br />PD/FD - PD Lighting/FD Expansion Tank <br />Approved <br />$1,727.33 <br />Yes <br />24 <br />7/9/2021 <br />88R <br />FD - Steam Generator <br />Approved <br />$6,071.95 <br />Revised to Use Contingency <br />Yes <br />6/10/2021 <br />89 <br />PD - Tile Duty Bags 176 <br />Approved <br />$495.00 <br />Owner Supplied Tile <br />Yes <br />6/25/2021 <br />90R <br />PD - Bollard and High Speed Door Conflict <br />Approved <br />$1,998.43 <br />Yes <br />26 <br />6/22/2021 <br />91 <br />PD - Floor Box Conference Room, FD - Steam Generator Breaker <br />Approved <br />$2,852.00 <br />Yes <br />6/22/2021 <br />92 <br />PD Site - Hydrant tie into 16" WM <br />Approved <br />$3,450.00 <br />$3500 NTE <br />Yes <br />25 <br />6/22/2021 <br />93 <br />PD Site - Storm Sewer Geothermal Conflict <br />Approved <br />$5,175.00 <br />Yes <br />140 <br />6/23/2021 <br />94 <br />PD - High Speed Door Entrance Transmitter/Receiver <br />Approved <br />$1,047.00 <br />Yes <br />150 <br />6/24/2021 <br />95 <br />EOC- Existing Carpet Removal <br />Approved <br />$1,524.00 <br />Yes <br />143 <br />6/24/2021 <br />96 <br />FD - Storage Room 120 Floor Drain Relocate <br />Approved <br />$321.98 <br />Yes <br />16 <br />6/24/2021 <br />97 <br />PD/FD - Epoxy Guide Lines, FD - HP-1 Panel Feed (ASI 15) <br />Approved <br />$448.00 <br />Yes <br />142 <br />7/2/2021 <br />98 <br />FD - Phase 2 Demo Clarifications (MEP Demo) <br />Approved <br />$1,625.29 <br />Yes <br />7/8/2021 <br />99 <br />PD - Duty Bag ACT Ceiling <br />Approved <br />$389.09 <br />Yes <br />7/9/2021 <br />100 <br />ERPS - Building Permit: GC Value Difference - Contingency Credit <br />Approved <br />($64,654.56) <br />1 <br />AIA C0#1 <br />N/A <br />7/9/2021 <br />101 <br />ERPS - Building Permit: Owner Paid Value - Contingency Credit <br />Approved <br />($62,101.44) <br />1 <br />AIA C0#1 <br />N/A <br />159 <br />7/13/2021 <br />102 <br />FD - Eliminate New Floor Drain at Mech Mezzanine <br />Approved <br />($1,319.94) <br />Yes <br />27 <br />7/20/2021 <br />103 <br />FD - Demo Clarifications <br />Approved <br />$1,810.00 <br />Yes <br />7/13/2021 <br />104 <br />PD- Klein T&M Underground Electrical Repairs <br />Approved <br />$1,206.00 <br />Yes <br />160 <br />7/14/2021 <br />105 <br />PD- North Fan Electrical Disconnect <br />Approved <br />$283.00 <br />Yes <br />7/14/2021 <br />106 <br />PD- 1st Floor Misc. Trim Work <br />Approved <br />$655.22 <br />Yes <br />7/19/2021 <br />107 <br />PD- 1st floor T&M Ceiling Work <br />Approved <br />$952.81 <br />Yes <br />7/15/2021 <br />108 <br />PD - Paint Ship Ladder <br />Approved <br />$1,192.10 <br />Yes <br />162 <br />7/20/2021 <br />1 109 <br />FD - Kitchen 117 Plumbing Questions <br />Approved <br />$1,681.11 <br />Yes <br />7/20/2021 <br />110 <br />PD - 1st Floor Corridor Carpet Base <br />Approved <br />$1,899.00 <br />Out of Stock - Production 812121 <br />Yes <br />7/22/2021 <br />111 R <br />EOC - Carpet Change <br />Approved <br />$3,658.00 <br />Out of Stock - Production 8/11/21 <br />Yes <br />7/22/2021 <br />112 <br />EOC- Projector Screen Demo <br />Rejected <br />N/A <br />7/22/2021 <br />113 <br />EOC- Electrical Demo & Rework <br />Approved <br />$2,000.00 <br />Yes <br />30 <br />7/22/2021 <br />114 <br />EOC - Upper Cabinets West Wall <br />Approved <br />$7,532.00 <br />Yes <br />7/22/2021 <br />115 <br />EOC - Under Cabinet Lights West Wall <br />Rejected <br />make light ready <br />N/A <br />7/22/2021 <br />116R <br />EOC- Re -Laminate West Wall Countertop <br />Approved <br />$1,360.00 <br />Yes <br />9/23/2021 <br />117R <br />EOC - ACT Patching <br />Approved <br />$2,001.74 <br />Update Time/Material Pricing <br />Yes <br />7/22/2021 <br />118 <br />EOC - Wall Skimming <br />Approved <br />$4,750.00 <br />Yes <br />28 <br />7/23/2021 <br />119 <br />PD- Fence Location <br />Approved <br />$3,424.00 <br />Yes <br />165 <br />7/23/2021 <br />120 <br />FD - Kitchen 117 Garbage Disposal <br />Approved <br />$419.80 <br />Yes <br />29 <br />146/163 <br />8/13/2021 <br />121 <br />FD - HP-29 Condensate Drain and Air Compressor <br />Approved <br />$10,055.76 <br />Yes <br />7/28/2021 <br />122 <br />FD - Refinish Existing "City Of Elk River" Sign <br />Approved <br />$1,378.00 <br />Yes <br />8/2/2021 <br />123 <br />PD - Swat Bay 171 Light Upgrade <br />Approved <br />$3,583.00 <br />1 <br />AIA C0#1 <br />Yes <br />8/2/2021 <br />124 <br />PD - Duty Bags 176 Occ Sensor <br />VOID <br />- <br />IN/A <br />Construction Change Order Log 10232018 Page 3 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.