Laserfiche WebLink
TarERoiv NumberStatic 05 <br />m Terra 0 k River Fire&ati on #3 <br />G O N S T R UCTI ON City of Elk River <br />CONTINUATION SHEET AIA DOCUMENTG703 <br />AIA Document G702, APPLICATION AND CERTIFICATION FOR PAYMENT, containing APPLICATION NO: 15 <br />Contractor's signed certification is attached. APPLICATION DATE: 4/30/22 <br />In tabulations below, amounts are stated to the nearest dollar. PERIOD TO: 4/30/22 <br />Use Column I on Contracts where variable retainage for line items may apply. <br />A <br />A.1 <br />B <br />C <br />CA <br />C.2 <br />C.3 <br />D E <br />F <br />G <br />H <br />I <br />SUBCONTRACTOR <br />ITEM <br />BID <br />DESCRIPTION OF WORK <br />SCHEDULED <br />CHANGE <br />BUDGET <br />REVISED <br />WORK COMPLETED <br />MATERIALS <br />TOTAL <br />% <br />BALANCE <br />RETAINAGE <br />VENDOR <br />NO. <br />PACK <br />VALUE <br />ORDERS <br />REVISION/ <br />SCHEDULED <br />PRESENTLY <br />COMPLETED <br />(G+C) <br />TO FINISH <br />(IF VARIABLE <br />FROM PREVIOUS <br />THIS PERIOD <br />EMPLOYEE <br />NO. <br />CONTINGENCY <br />VALUE <br />APPLICATION <br />STORED <br />AND STORED <br />(C -G) <br />RATE) <br />COST <br />TRANSFER <br />(D+E) <br />(NOT IN <br />TO DATE <br />CODE <br />D OR E) <br />(D+E+F) <br />Patriot Erectors <br />05-5121 <br />5B <br />CO#13 RFI#140 Rapelling Anchors <br />$ - <br />$ - <br />$ 1,219.00 <br />$ 1,219.00 <br />$ 1,219.00 <br />$ 1,219.00 <br />100.00% <br />$ - <br />$ 60.95 <br />Century Construction <br />06-6100 <br />6A <br />Performance & Payment Bond <br />$ 6,400.00 <br />$ - <br />$ - <br />$ 6,400.00 <br />$ 6,400.00 <br />$ 6,400.00 <br />100.00% <br />$ - <br />$ 320.00 <br />Ce ntury Construction <br />06-6100 <br />6A <br />Allowance <br />$ 10,000.00 <br />$ - <br />$ - <br />$ 10,000.00 <br />$ 6,069.50 <br />$ 6,069.50 <br />60.70% <br />$ 3,930.50 <br />$ 303.48 <br />Century Construction <br />06-6100 <br />6A <br />Mobilization <br />$ 3,100.00 <br />$ - <br />$ - <br />$ 3,100.00 <br />$ 2,170.00 <br />$ 310.00 <br />$ 2,480.00 <br />80.00% <br />$ 620.00 <br />$ 124.00 <br />Century Construction <br />06-6100 <br />6A <br />Materials <br />$ 97,000.00 <br />$ - <br />$ - <br />$ 97,000.00 <br />$ 58,508.00 <br />$ 16,490.00 <br />$ 74,998.00 <br />77.32% <br />$ 22,002.00 <br />$ 3,749.90 <br />Century Construction <br />06-6100 <br />6A <br />Material Blocking <br />$ 12,000.00 <br />$ - <br />$ - <br />$ 12,000.00 <br />$ 12,000.00 <br />$ 12,000.00 <br />100.00% <br />$ - <br />$ 600.00 <br />Century Construction <br />06-6100 <br />6A <br />Install Roof Blocking <br />$ 43,000.00 <br />$ - <br />$ - <br />$ 43,000.00 <br />$ 43,000.00 <br />$ 43,000.00 <br />100.00% <br />$ - <br />$ 2,150.00 <br />Century Construction <br />06-6100 <br />6A <br />Install In Wall Blocking <br />$ 8,000.00 <br />$ - <br />$ - <br />$ 8,000.00 <br />$ 8,000.00 <br />$ 8,000.00 <br />100.00% <br />$ - <br />$ 400.00 <br />Century Construction <br />06-6100 <br />6A <br />Cabinets and Millwork <br />$ 8,500.00 <br />$ - <br />$ - <br />$ 8,500.00 <br />$ 8,500.00 <br />$ 8,500.00 <br />100.00% <br />$ - <br />$ 425.00 <br />Century Construction <br />06-6100 <br />6A <br />Specialties <br />$ 32,000.00 <br />$ - <br />$ - <br />$ 32,000.00 <br />$ - <br />$ 8,000.00 <br />$ 8,000.00 <br />25.00% <br />$ 24,000.00 <br />$ 400.00 <br />Century Construction <br />06-6100 <br />6A <br />Temp Enclosures <br />$ 6,000.00 <br />$ - <br />$ - <br />$ 6,000.00 <br />$ 6,000.00 <br />$ 6,000.00 <br />100.00% <br />$ - <br />$ 300.00 <br />Century Construction <br />06-6100 <br />6A <br />Doors & Hardware <br />$ 17,000.00 <br />$ - <br />$ - <br />$ 17,000.00 <br />$ 17,000.00 <br />$ 17,000.00 <br />100.00% <br />$ - <br />$ 850.00 <br />Century Construction <br />06-6100 <br />6A <br />C041 For Distinctive to Predrill Sill Angles <br />$ - <br />$ - <br />$ (676.41) <br />$ (676.41) <br />$ (676.41) <br />$ (676.41) <br />100.00% <br />$ - <br />$ (33.82) <br />Century Construction <br />06-6100 <br />6A <br />C042 PR#15 Flagpoles <br />$ - <br />$ - <br />$ (277.00) <br />$ (277.00) <br />$ (277.00) <br />$ (277.00) <br />100.00% <br />$ - <br />$ (13.85) <br />Century Construction <br />06-6100 <br />6A <br />C043 Disctinctive Predrill Holes for Operable Partition <br />$ - <br />$ - <br />$ (468.54) <br />$ (468.54) <br />$ (468.54) <br />$ (468.54) <br />100.00% <br />$ - <br />$ (23.43) <br />Century Construction <br />06-6100 <br />6A <br />C044 Wood Blockingat Heads of W1 (Used $855 of Allowance) <br />$ - <br />$ - <br />$ - <br />$ - <br />$ - <br />$ - <br />#DIV/01 <br />$ - <br />$ - <br />Century Construction <br />06-6100 <br />6A <br />C045 RFI#110 Wood Blocking <br />$ - <br />$ - <br />$ 534.35 <br />$ 534.35 <br />$ 534.35 <br />$ 534.35 <br />100.00% <br />$ - <br />$ 26.72 <br />Century Construction <br />06-6100 <br />6A <br />C046 Allowance Usage (Remaining $8,290) <br />$ - <br />$ - <br />$ - <br />$ - <br />$ - <br />$ - <br />#DIV/01 <br />$ - <br />$ - <br />Century Construction <br />06-6100 <br />6A <br />C047 Allowance Usage (Remaining $7,018) <br />$ - <br />$ - <br />$ (1,272.00) <br />$ (1,272.00) <br />$ (1,272.00) <br />$ (1,272.00) <br />100.00% <br />$ <br />$ (63.60) <br />Century Construction <br />06-6100 <br />6A <br />C048PR#18Added Paper Towel/Trash Units <br />$ - <br />$ - <br />$ 2,248.00 <br />$ 2,248.00 <br />$ 2,248.00 <br />$ 2,248.00 <br />100.00% <br />$ - <br />$ 112.40 <br />Century Construction <br />06-6100 <br />6A <br />C099 CSI Div-10 Additional Charges <br />$ - <br />$ - <br />$ 2,335.50 <br />$ 2,335.50 <br />$ 87.50 <br />$ 87.50 <br />3.75% <br />$ 2,248.00 <br />$ 4.38 <br />Century Construction <br />06-6100 <br />6A <br />CO#10 Interior Signage <br />$ - <br />$ - <br />$ (572.82) <br />$ (572.82) <br />$ (572.82) <br />$ (572.82) <br />100.00% <br />$ - <br />$ (28.64) <br />Century Construction <br />06-6100 <br />6A <br />CO#11 Allowance Usgage (Remaining $3930.50) <br />$ - <br />$ - <br />$ - <br />$ - <br />$ - <br />$ - <br />#DIV/01 <br />$ <br />$ - <br />Century Construction <br />06-6100 <br />6A <br />CO#12 RFI#201 Bondo and Reinstall Door 108 <br />$ - <br />$ - <br />$ 479.27 <br />$ 479.27 <br />$ - <br />$ - <br />0.00% <br />$ 479.27 <br />$ - <br />Northern Woodwork <br />06-6400 <br />6B <br />Architectural Millwork <br />$ 45,900.00 <br />$ - <br />$ - <br />$ 45,900.00 <br />$ 17,917.64 <br />$ 27,982.36 <br />$ 45,900.00 <br />100.00% <br />$ - <br />$ 2,295.00 <br />Northern Woodwork <br />06-6400 <br />6B <br />C041 PR#18 <br />$ - <br />$ - <br />$ 165.00 <br />$ 165.00 <br />$ 165.00 <br />$ 165.00 <br />100.00% <br />$ - <br />$ 8.25 <br />Quality Coatings <br />07-7210 <br />7C <br />Fluid Applied Air Barrier <br />$ 38,600.00 <br />$ - <br />$ - <br />$ 38,600.00 <br />$ 38,600.00 <br />$ 38,600.00 <br />100.00% <br />$ - <br />$ 1,930.00 <br />Quality Coatings <br />07-7210 <br />7C <br />C041 ASI#8R Removal of Tranisition Membrane <br />$ - <br />$ - <br />$ (800.00) <br />$ (800.00) <br />$ (800.00) <br />$ (800.00) <br />100.00% <br />$ - <br />$ (40.00) <br />Quality Coatings <br />07-7210 <br />7C <br />C042 Remove and Reinstall AS at W1 <br />$ - <br />$ - <br />$ 1,590.00 <br />$ 1,590.00 <br />$ 1,590.00 <br />$ 1,590.00 <br />100.00% <br />$ - <br />$ 79.50 <br />Quality Coatings <br />07-7210 <br />7C <br />C043 PR#20 <br />$ - <br />$ - <br />$ (200.00) <br />$ (200.00) <br />$ - <br />$ - <br />0.00% <br />$ (200.00) <br />$ - <br />Horizon Roofing <br />07-7520 <br />7A& 7B <br />Roofing& Metal Wall Panels <br />$ 385,124.00 <br />$ - <br />$ - <br />$ 385,124.00 <br />$ 332,347.80 <br />$ 35,762.44 <br />$ 368,110.24 <br />95.58% <br />$ 17,013.76 <br />$ 18,405.51 <br />Horizon Roofing <br />07-7520 <br />7A&7B <br />C041 ASI#5 LTAngles <br />$ - <br />$ - <br />$ 5,750.00 <br />$ 5,750.00 <br />$ 5,750.00 <br />$ 5,750.00 <br />100.00% <br />$ - <br />$ 287.50 <br />Horizon Roofing <br />07-7520 <br />7A & 7B <br />C042 ASI#8R Reduction of Roof Membrane <br />$ - <br />$ - <br />$ 2,600.00 <br />$ 2,600.00 <br />$ 2,600.00 <br />$ 2,600.00 <br />100.00% <br />$ - <br />$ 130.00 <br />Horizon Roofing <br />07-7520 <br />7A&7B <br />C043 PR#14 Parapet Roofing Membrane <br />$ - <br />$ - <br />$ (1,650.00) <br />$ (1,650.00) <br />$ (1,650.00) <br />$ (1,650.00) <br />100.00% <br />$ - <br />$ (82.50) <br />Horizon Roofing <br />07-7520 <br />7A&7B <br />C044 Overtime Work on 11/6 <br />$ - <br />$ - <br />$ 2,682.00 <br />$ 2,682.00 <br />$ 2,682.00 <br />$ 2,682.00 <br />100.00% <br />$ - <br />$ 134.10 <br />Horizon Roofing <br />07-7520 <br />7A&7B <br />C045 RFI#100 <br />$ - <br />$ - <br />$ 1,350.00 <br />$ 1,350.00 <br />$ - <br />$ - <br />0.00% <br />$ 1,350.00 <br />$ - <br />HorizonRoofing <br />07-7520 <br />7A&7B <br />C0464th Floor Training Tower Roofing Membrane <br />$ - <br />$ - <br />$ (935.00) <br />$ (935.00) <br />$ - <br />$ - <br />0.00% <br />$ (935.00) <br />$ - <br />HorizonRoofing <br />07-7520 <br />7A&7B <br />C047 Wall Reflashingattops of Parapet Walls <br />$ - <br />$ - <br />$ 1,425.00 <br />$ 1,425.00 <br />$ - <br />$ 1,425.00 <br />$ 1,425.00 <br />100.00% <br />$ - <br />$ 71.25 <br />Horizon Roofing <br />07-7520 <br />7A & 7B <br />C048 Emergency Repairs on 12/17 <br />$ - <br />$ - <br />$ 1,325.00 <br />$ 1,325.00 <br />$ - <br />$ 1,325.00 <br />$ 1,325.00 <br />100.00% <br />$ - <br />$ 66.25 <br />Horizon Roofing <br />07-7520 <br />7A&7B <br />C049 Saddle Repair at existingsaddle at North Training Tower <br />$ - <br />$ - <br />$ 2,980.00 <br />$ 2,980.00 <br />$ - <br />$ 2,980.00 <br />$ 2,980.00 <br />100.00% <br />$ - <br />$ 149.00 <br />Spec <br />07-7520 <br />RFI#163 Training Tower Roofing Membrane <br />$ - <br />$ 5,513.00 <br />$ 5,513.00 <br />$ 5,513.00 <br />$ 5,513.00 <br />100.00% <br />$ - <br />$ 275.65 <br />Sunrise Speciality <br />07-7900 <br />7D <br />Joint Sealants <br />$ 45,470.00 <br />$ - <br />$ - <br />$ 45,470.00 <br />$ 22,735.00 <br />$ 9,094.00 <br />$ 31,829.00 <br />70.00% <br />$ 13,641.00 <br />$ 1,591.45 <br />Page 3 / 10 <br />