Laserfiche WebLink
TarERoiv NumberStatic 05 <br />m Terra 0 k River Fire&ati on #3 <br />G O N S T R UCTI ON City of Elk River <br />CONTINUATION SHEET AIA DOCUMENTG703 <br />AIA Document G702, APPLICATION AND CERTIFICATION FOR PAYMENT, containing APPLICATION NO: 15 <br />Contractor's signed certification is attached. APPLICATION DATE: 4/30/22 <br />In tabulations below, amounts are stated to the nearest dollar. PERIOD TO: 4/30/22 <br />Use Column I on Contracts where variable retainage for line items may apply. <br />A <br />A.1 <br />B <br />C <br />CA <br />C.2 <br />C.3 <br />D E <br />F <br />G <br />H <br />I <br />SUBCONTRACTOR <br />ITEM <br />BID <br />DESCRIPTION OF WORK <br />SCHEDULED <br />CHANGE <br />BUDGET <br />REVISED <br />WORK COMPLETED <br />MATERIALS <br />TOTAL <br />% <br />BALANCE <br />RETAINAGE <br />VENDOR <br />NO. <br />PACK <br />VALUE <br />ORDERS <br />REVISION/ <br />SCHEDULED <br />PRESENTLY <br />COMPLETED <br />(G+C) <br />TO FINISH <br />(IF VARIABLE <br />FROM PREVIOUS <br />THIS PERIOD <br />EMPLOYEE <br />NO. <br />CONTINGENCY <br />VALUE <br />APPLICATION <br />STORED <br />AND STORED <br />(C -G) <br />RATE) <br />COST <br />TRANSFER <br />(D+E) <br />(NOT IN <br />TO DATE <br />CODE <br />D OR E) <br />(D+E+F) <br />Sunrise Speciality <br />07-7900 <br />7D <br />CO#1 PR#2R Clerestory Head Detail <br />$ - <br />$ - <br />$ 35.00 <br />$ 35.00 <br />$ - <br />$ - <br />0.00% <br />$ 35.00 <br />$ - <br />Mid -Central Door <br />08-8200 <br />SA <br />Hardware <br />$ 41,653.67 <br />$ - <br />$ - <br />$ 41,653.67 <br />$ 24,041.51 <br />$ 24,041.51 <br />57.72% <br />$ 17,612.16 <br />$ 1,202.08 <br />Mid -Central Door <br />08-8200 <br />SA <br />HM Door <br />$ 22,208.67 <br />$ - <br />$ - <br />$ 22,208.67 <br />$ 22,208.67 <br />$ 22,208.67 <br />100.00% <br />$ - <br />$ 1,110.43 <br />Mid -Central Door <br />08-8200 <br />SA <br />HM Frame <br />$ 19,666.66 <br />$ - <br />$ - <br />$ 19,666.66 <br />$ 19,666.66 <br />$ 19,666.66 <br />100.00% <br />$ - <br />$ 983.33 <br />Mid -Central Door <br />08-8200 <br />SA <br />Specialty <br />$ 3,133.00 <br />$ - <br />$ - <br />$ 3,133.00 <br />$ 3,133.00 <br />$ 3,133.00 <br />100.00% <br />$ - <br />$ 156.65 <br />Mid -Central Door <br />08-8200 <br />SA <br />WD Door <br />$ 7,727.00 <br />$ - <br />$ - <br />$ 7,727.00 <br />$ - <br />$ 939.65 <br />$ 939.65 <br />12.16% <br />$ 6,787.35 <br />$ 46.98 <br />Mid -Central Door <br />08-8200 <br />SA <br />CO#1 Door Hardware Revisions (5/5/21) <br />$ - <br />$ - <br />$ 2,152.97 <br />$ 2,152.97 <br />$ 2,152.97 <br />$ 2,152.97 <br />100.00% <br />$ - <br />$ 107.65 <br />Mid -Central Door <br />08-8200 <br />SA <br />CO#2 Door Frame 108 Refab Door (From Camco) <br />$ - <br />$ - <br />$ 740.00 <br />$ 740.00 <br />$ - <br />$ 740.00 <br />$ 740.00 <br />100.00% <br />$ - <br />$ 37.00 <br />American Door Works <br />08-8361 <br />SB <br />Sectional Overhead Doors <br />$ 170,570.00 <br />$ - <br />$ - <br />$ 170,570.00 <br />$ - <br />$ - <br />0.00% <br />$ 170,570.00 <br />$ - <br />American Door Works <br />08-8361 <br />SB <br />CO#1 PR#2 Overhead Doors & Circuiting <br />$ - <br />$ - <br />$ (37,217.00) <br />$ (37,217.00) <br />$ - <br />$ - <br />0.00% <br />$ (37,217.00) <br />$ - <br />American Door Works <br />08-8361 <br />SB <br />CO#2 PR#12 Revised the 3 OH Doors <br />$ - <br />$ - <br />$ (36,410.00) <br />$ (36,410.00) <br />$ - <br />$ - <br />0.00% <br />$ (36,410.00) <br />$ - <br />Hallmark Glass <br />08-8800 <br />SC <br />Shop Drawings <br />$ 3,500.00 <br />$ - <br />$ - <br />$ 3,500.00 <br />$ 3,500.00 <br />$ 3,500.00 <br />100.00% <br />$ - <br />$ 175.00 <br />Hallmark Glass <br />08-8800 <br />SC <br />Bond <br />$ 5,000.00 <br />$ - <br />$ - <br />$ 5,000.00 <br />$ 5,000.00 <br />$ 5,000.00 <br />100.00% <br />$ - <br />$ 250.00 <br />Hallmark Glass <br />08-8800 <br />SC <br />Aluminum Labor <br />$ 32,630.00 <br />$ - <br />$ - <br />$ 32,630.00 <br />$ 32,630.00 <br />$ 32,630.00 <br />100.00% <br />$ - <br />$ 1,631.50 <br />Hallmark Glass <br />08-8800 <br />SC <br />Aluminum Material <br />$ 48,750.00 <br />$ - <br />$ - <br />$ 48,750.00 <br />$ 48,750.00 <br />$ 48,750.00 <br />100.00% <br />$ - <br />$ 2,437.50 <br />Hallmark Glass <br />08-8800 <br />SC <br />Door Hardware Labor <br />$ 3,000.00 <br />$ - <br />$ - <br />$ 3,000.00 <br />$ 3,000.00 <br />$ 3,000.00 <br />100.00% <br />$ - <br />$ 150.00 <br />Hallmark Glass <br />08-8800 <br />SC <br />Door Hardware material <br />$ 26,000.00 <br />$ <br />$ - <br />$ 26,000.00 <br />$ 26,000.00 <br />$ 26,000.00 <br />100.00% <br />$ - <br />$ 1,300.00 <br />Hallmark Glass <br />08-8800 <br />SC <br />Glass & Glazing Labor <br />$ 10,200.00 <br />$ - <br />$ - <br />$ 10,200.00 <br />$ 9,200.00 <br />$ 1,000.00 <br />$ 10,200.00 <br />100.00% <br />$ - <br />$ 510.00 <br />Hallmark Glass <br />08-8800 <br />SC <br />Glass& Glazing Material <br />$ 29,000.00 <br />$ - <br />$ - <br />$ 29,000.00 <br />$ 29,000.00 <br />$ 29,000.00 <br />100.00% <br />$ - <br />$ 1,450.00 <br />Hallmark Glass <br />08-8800 <br />SC <br />Arch Louvers Labor <br />$ 1,620.00 <br />$ - <br />$ - <br />$ 1,620.00 <br />$ 1,620.00 <br />$ 1,620.00 <br />100.00% <br />$ - <br />$ 81.00 <br />Hallmark Glass <br />08-8800 <br />SC <br />Arch Louvers Material <br />$ 3,800.00 <br />$ - <br />$ - <br />$ 3,800.00 <br />$ 3,800.00 <br />$ 3,800.00 <br />100.00% <br />$ - <br />$ 190.00 <br />Hallmark Glass <br />08-8800 <br />SC <br />CO#1 RFI#181 SF 140X SF Head Detail <br />$ - <br />$ - <br />$ 362.00 <br />$ 362.00 <br />$ 362.00 <br />$ 362.00 <br />100.00% <br />$ - <br />$ 18.10 <br />Niemela Design and Construction <br />09-9250 <br />9A <br />Framing- Material <br />$ 19,873.00 <br />$ - <br />$ - <br />$ 19,873.00 <br />$ 19,873.00 <br />$ 19,873.00 <br />100.00% <br />$ - <br />$ 993.65 <br />Niemela Design and Construction <br />09-9250 <br />9A <br />Insulation - Material <br />$ 5,063.00 <br />$ - <br />$ - <br />$ 5,063.00 <br />$ 5,063.00 <br />$ 5,063.00 <br />100.00% <br />$ - <br />$ 253.15 <br />Niemela Design and Construction <br />09-9250 <br />9A <br />Drywall- Material <br />$ 20,024.00 <br />$ - <br />$ - <br />$ 20,024.00 <br />$ 20,024.00 <br />$ 20,024.00 <br />100.00% <br />$ - <br />$ 1,001.20 <br />Niemela Design and Construction <br />09-9250 <br />9A <br />Taping/Finishing- Material <br />$ 2,930.00 <br />$ - <br />$ - <br />$ 2,930.00 <br />$ 2,930.00 <br />$ 2,930.00 <br />100.00% <br />$ - <br />$ 146.50 <br />Niemela Design and Construction <br />09-9250 <br />9A <br />Sealants/Acoustical- Material <br />$ 2,500.00 <br />$ - <br />$ - <br />$ 2,500.00 <br />$ 2,500.00 <br />$ 2,500.00 <br />100.00% <br />$ - <br />$ 125.00 <br />Niemela Design and Construction <br />09-9250 <br />9A <br />FRP - Material <br />$ 806.00 <br />$ - <br />$ - <br />$ 806.00 <br />$ 806.00 <br />$ 806.00 <br />100.00% <br />$ - <br />$ 40.30 <br />Niemela Design and Construction <br />09-9250 <br />9A <br />Framing- Labor <br />$ 33,795.00 <br />$ - <br />$ - <br />$ 33,795.00 <br />$ 33,795.00 <br />$ 33,795.00 <br />100.00% <br />$ - <br />$ 1,689.75 <br />Niemela Design and Construction <br />09-9250 <br />9A <br />Insulation - Labor <br />$ 6,500.00 <br />$ - <br />$ - <br />$ 6,500.00 <br />$ 6,500.00 <br />$ 6,500.00 <br />100.00% <br />$ - <br />$ 325.00 <br />Niemela Design and Construction <br />09-9250 <br />9A <br />Drywall- Labor <br />$ 22,810.00 <br />$ - <br />$ - <br />$ 22,810.00 <br />$ 22,710.00 <br />$ 22,710.00 <br />99.56% <br />$ 100.00 <br />$ 1,135.50 <br />Niemela Design and Construction <br />09-9250 <br />9A <br />Taping/Finishing- Labor <br />$ 23,301.00 <br />$ - <br />$ - <br />$ 23,301.00 <br />$ 23,151.00 <br />$ 23,151.00 <br />99.36% <br />$ 150.00 <br />$ 1,157.55 <br />Niemela Design and Construction <br />09-9250 <br />9A <br />Sealants/Acoustical- Labor <br />$ 3,000.00 <br />$ - <br />$ - <br />$ 3,000.00 <br />$ 3,000.00 <br />$ 3,000.00 <br />100.00% <br />$ - <br />$ 150.00 <br />Niemela Design and Construction <br />09-9250 <br />9A <br />FRP - Labor <br />$ 630.00 <br />$ - <br />$ - <br />$ 630.00 <br />$ 630.00 <br />$ 630.00 <br />100.00% <br />$ - <br />$ 31.50 <br />Niemela Design and Construction <br />09-9250 <br />9A <br />Equipment- Lift <br />$ 7,500.00 <br />$ - <br />$ - <br />$ 7,500.00 <br />$ 7,500.00 <br />$ 7,500.00 <br />100.00% <br />$ - <br />$ 375.00 <br />Niemela Design and Construction <br />09-9250 <br />9A <br />Mobilization <br />$ 5,000.00 <br />$ - <br />$ - <br />$ 5,000.00 <br />$ 5,000.00 <br />$ 5,000.00 <br />100.00% <br />$ - <br />$ 250.00 <br />Niemela Design and Construction <br />09-9250 <br />9A <br />Bonding <br />$ 2,915.00 <br />$ - <br />$ - <br />$ 2,915.00 <br />$ 2,915.00 <br />$ 2,915.00 <br />100.00% <br />$ - <br />$ 145.75 <br />Niemela Design and Construction <br />09-9250 <br />9A <br />Allowance (Terra Directed) <br />$ 5,000.00 <br />$ - <br />$ - <br />$ 5,000.00 <br />$ - <br />$ - <br />0.00% <br />$ 5,000.00 <br />$ - <br />Niemela Design and Construction <br />09-9250 <br />9A <br />Allowance -Access Panels <br />$ 2,000.00 <br />$ - <br />$ - <br />$ 2,000.00 <br />$ - <br />$ - <br />0.00% <br />$ 2,000.00 <br />$ - <br />Niemela Design and Construction <br />09-9250 <br />9A <br />CO#1 PR#2R Clerestory Head Detail <br />$ - <br />$ <br />$ 4,963.35 <br />$ 4,963.35 <br />$ 4,963.35 <br />$ 4,963.35 <br />100.00% <br />$ - <br />$ 248.17 <br />Niemela Design and Construction <br />09-9250 <br />9A <br />CO#2 PR#3R <br />$ - <br />$ - <br />$ (357.00) <br />$ (357.00) <br />$ (357.00) <br />$ (357.00) <br />100.00% <br />$ - <br />$ (17.85) <br />Niemela Design and Construction <br />09-9250 <br />9A <br />CO#3 ASI#9 Soffit Revisions <br />$ - <br />$ <br />$ 295.00 <br />$ 295.00 <br />$ 295.00 <br />$ 295.00 <br />100.00% <br />$ - <br />$ 14.75 <br />Niemela Design and Construction <br />09-9250 <br />9A <br />CO#4 RFI#107 <br />$ - <br />$ - <br />$ 213.00 <br />$ 213.00 <br />$ 213.00 <br />$ 213.00 <br />100.00% <br />$ - <br />$ 10.65 <br />Niemela Design and Construction <br />09-9250 <br />9A <br />CO#5 RFI#100 <br />$ - <br />$ - <br />$ 433.00 <br />$ 433.00 <br />$ 433.00 <br />$ 433.00 <br />100.00% <br />$ - <br />$ 21.65 <br />Page 4 / 10 <br />