TarERoiv NumberStatic 05
<br />m Terra 0 k River Fire&ati on #3
<br />G O N S T R UCTI ON City of Elk River
<br />CONTINUATION SHEET AIA DOCUMENTG703
<br />AIA Document G702, APPLICATION AND CERTIFICATION FOR PAYMENT, containing APPLICATION NO: 15
<br />Contractor's signed certification is attached. APPLICATION DATE: 4/30/22
<br />In tabulations below, amounts are stated to the nearest dollar. PERIOD TO: 4/30/22
<br />Use Column I on Contracts where variable retainage for line items may apply.
<br />A
<br />A.1
<br />B
<br />C
<br />CA
<br />C.2
<br />C.3
<br />D E
<br />F
<br />G
<br />H
<br />I
<br />SUBCONTRACTOR
<br />ITEM
<br />BID
<br />DESCRIPTION OF WORK
<br />SCHEDULED
<br />CHANGE
<br />BUDGET
<br />REVISED
<br />WORK COMPLETED
<br />MATERIALS
<br />TOTAL
<br />%
<br />BALANCE
<br />RETAINAGE
<br />VENDOR
<br />NO.
<br />PACK
<br />VALUE
<br />ORDERS
<br />REVISION/
<br />SCHEDULED
<br />PRESENTLY
<br />COMPLETED
<br />(G+C)
<br />TO FINISH
<br />(IF VARIABLE
<br />FROM PREVIOUS
<br />THIS PERIOD
<br />EMPLOYEE
<br />NO.
<br />CONTINGENCY
<br />VALUE
<br />APPLICATION
<br />STORED
<br />AND STORED
<br />(C -G)
<br />RATE)
<br />COST
<br />TRANSFER
<br />(D+E)
<br />(NOT IN
<br />TO DATE
<br />CODE
<br />D OR E)
<br />(D+E+F)
<br />Sunrise Speciality
<br />07-7900
<br />7D
<br />CO#1 PR#2R Clerestory Head Detail
<br />$ -
<br />$ -
<br />$ 35.00
<br />$ 35.00
<br />$ -
<br />$ -
<br />0.00%
<br />$ 35.00
<br />$ -
<br />Mid -Central Door
<br />08-8200
<br />SA
<br />Hardware
<br />$ 41,653.67
<br />$ -
<br />$ -
<br />$ 41,653.67
<br />$ 24,041.51
<br />$ 24,041.51
<br />57.72%
<br />$ 17,612.16
<br />$ 1,202.08
<br />Mid -Central Door
<br />08-8200
<br />SA
<br />HM Door
<br />$ 22,208.67
<br />$ -
<br />$ -
<br />$ 22,208.67
<br />$ 22,208.67
<br />$ 22,208.67
<br />100.00%
<br />$ -
<br />$ 1,110.43
<br />Mid -Central Door
<br />08-8200
<br />SA
<br />HM Frame
<br />$ 19,666.66
<br />$ -
<br />$ -
<br />$ 19,666.66
<br />$ 19,666.66
<br />$ 19,666.66
<br />100.00%
<br />$ -
<br />$ 983.33
<br />Mid -Central Door
<br />08-8200
<br />SA
<br />Specialty
<br />$ 3,133.00
<br />$ -
<br />$ -
<br />$ 3,133.00
<br />$ 3,133.00
<br />$ 3,133.00
<br />100.00%
<br />$ -
<br />$ 156.65
<br />Mid -Central Door
<br />08-8200
<br />SA
<br />WD Door
<br />$ 7,727.00
<br />$ -
<br />$ -
<br />$ 7,727.00
<br />$ -
<br />$ 939.65
<br />$ 939.65
<br />12.16%
<br />$ 6,787.35
<br />$ 46.98
<br />Mid -Central Door
<br />08-8200
<br />SA
<br />CO#1 Door Hardware Revisions (5/5/21)
<br />$ -
<br />$ -
<br />$ 2,152.97
<br />$ 2,152.97
<br />$ 2,152.97
<br />$ 2,152.97
<br />100.00%
<br />$ -
<br />$ 107.65
<br />Mid -Central Door
<br />08-8200
<br />SA
<br />CO#2 Door Frame 108 Refab Door (From Camco)
<br />$ -
<br />$ -
<br />$ 740.00
<br />$ 740.00
<br />$ -
<br />$ 740.00
<br />$ 740.00
<br />100.00%
<br />$ -
<br />$ 37.00
<br />American Door Works
<br />08-8361
<br />SB
<br />Sectional Overhead Doors
<br />$ 170,570.00
<br />$ -
<br />$ -
<br />$ 170,570.00
<br />$ -
<br />$ -
<br />0.00%
<br />$ 170,570.00
<br />$ -
<br />American Door Works
<br />08-8361
<br />SB
<br />CO#1 PR#2 Overhead Doors & Circuiting
<br />$ -
<br />$ -
<br />$ (37,217.00)
<br />$ (37,217.00)
<br />$ -
<br />$ -
<br />0.00%
<br />$ (37,217.00)
<br />$ -
<br />American Door Works
<br />08-8361
<br />SB
<br />CO#2 PR#12 Revised the 3 OH Doors
<br />$ -
<br />$ -
<br />$ (36,410.00)
<br />$ (36,410.00)
<br />$ -
<br />$ -
<br />0.00%
<br />$ (36,410.00)
<br />$ -
<br />Hallmark Glass
<br />08-8800
<br />SC
<br />Shop Drawings
<br />$ 3,500.00
<br />$ -
<br />$ -
<br />$ 3,500.00
<br />$ 3,500.00
<br />$ 3,500.00
<br />100.00%
<br />$ -
<br />$ 175.00
<br />Hallmark Glass
<br />08-8800
<br />SC
<br />Bond
<br />$ 5,000.00
<br />$ -
<br />$ -
<br />$ 5,000.00
<br />$ 5,000.00
<br />$ 5,000.00
<br />100.00%
<br />$ -
<br />$ 250.00
<br />Hallmark Glass
<br />08-8800
<br />SC
<br />Aluminum Labor
<br />$ 32,630.00
<br />$ -
<br />$ -
<br />$ 32,630.00
<br />$ 32,630.00
<br />$ 32,630.00
<br />100.00%
<br />$ -
<br />$ 1,631.50
<br />Hallmark Glass
<br />08-8800
<br />SC
<br />Aluminum Material
<br />$ 48,750.00
<br />$ -
<br />$ -
<br />$ 48,750.00
<br />$ 48,750.00
<br />$ 48,750.00
<br />100.00%
<br />$ -
<br />$ 2,437.50
<br />Hallmark Glass
<br />08-8800
<br />SC
<br />Door Hardware Labor
<br />$ 3,000.00
<br />$ -
<br />$ -
<br />$ 3,000.00
<br />$ 3,000.00
<br />$ 3,000.00
<br />100.00%
<br />$ -
<br />$ 150.00
<br />Hallmark Glass
<br />08-8800
<br />SC
<br />Door Hardware material
<br />$ 26,000.00
<br />$
<br />$ -
<br />$ 26,000.00
<br />$ 26,000.00
<br />$ 26,000.00
<br />100.00%
<br />$ -
<br />$ 1,300.00
<br />Hallmark Glass
<br />08-8800
<br />SC
<br />Glass & Glazing Labor
<br />$ 10,200.00
<br />$ -
<br />$ -
<br />$ 10,200.00
<br />$ 9,200.00
<br />$ 1,000.00
<br />$ 10,200.00
<br />100.00%
<br />$ -
<br />$ 510.00
<br />Hallmark Glass
<br />08-8800
<br />SC
<br />Glass& Glazing Material
<br />$ 29,000.00
<br />$ -
<br />$ -
<br />$ 29,000.00
<br />$ 29,000.00
<br />$ 29,000.00
<br />100.00%
<br />$ -
<br />$ 1,450.00
<br />Hallmark Glass
<br />08-8800
<br />SC
<br />Arch Louvers Labor
<br />$ 1,620.00
<br />$ -
<br />$ -
<br />$ 1,620.00
<br />$ 1,620.00
<br />$ 1,620.00
<br />100.00%
<br />$ -
<br />$ 81.00
<br />Hallmark Glass
<br />08-8800
<br />SC
<br />Arch Louvers Material
<br />$ 3,800.00
<br />$ -
<br />$ -
<br />$ 3,800.00
<br />$ 3,800.00
<br />$ 3,800.00
<br />100.00%
<br />$ -
<br />$ 190.00
<br />Hallmark Glass
<br />08-8800
<br />SC
<br />CO#1 RFI#181 SF 140X SF Head Detail
<br />$ -
<br />$ -
<br />$ 362.00
<br />$ 362.00
<br />$ 362.00
<br />$ 362.00
<br />100.00%
<br />$ -
<br />$ 18.10
<br />Niemela Design and Construction
<br />09-9250
<br />9A
<br />Framing- Material
<br />$ 19,873.00
<br />$ -
<br />$ -
<br />$ 19,873.00
<br />$ 19,873.00
<br />$ 19,873.00
<br />100.00%
<br />$ -
<br />$ 993.65
<br />Niemela Design and Construction
<br />09-9250
<br />9A
<br />Insulation - Material
<br />$ 5,063.00
<br />$ -
<br />$ -
<br />$ 5,063.00
<br />$ 5,063.00
<br />$ 5,063.00
<br />100.00%
<br />$ -
<br />$ 253.15
<br />Niemela Design and Construction
<br />09-9250
<br />9A
<br />Drywall- Material
<br />$ 20,024.00
<br />$ -
<br />$ -
<br />$ 20,024.00
<br />$ 20,024.00
<br />$ 20,024.00
<br />100.00%
<br />$ -
<br />$ 1,001.20
<br />Niemela Design and Construction
<br />09-9250
<br />9A
<br />Taping/Finishing- Material
<br />$ 2,930.00
<br />$ -
<br />$ -
<br />$ 2,930.00
<br />$ 2,930.00
<br />$ 2,930.00
<br />100.00%
<br />$ -
<br />$ 146.50
<br />Niemela Design and Construction
<br />09-9250
<br />9A
<br />Sealants/Acoustical- Material
<br />$ 2,500.00
<br />$ -
<br />$ -
<br />$ 2,500.00
<br />$ 2,500.00
<br />$ 2,500.00
<br />100.00%
<br />$ -
<br />$ 125.00
<br />Niemela Design and Construction
<br />09-9250
<br />9A
<br />FRP - Material
<br />$ 806.00
<br />$ -
<br />$ -
<br />$ 806.00
<br />$ 806.00
<br />$ 806.00
<br />100.00%
<br />$ -
<br />$ 40.30
<br />Niemela Design and Construction
<br />09-9250
<br />9A
<br />Framing- Labor
<br />$ 33,795.00
<br />$ -
<br />$ -
<br />$ 33,795.00
<br />$ 33,795.00
<br />$ 33,795.00
<br />100.00%
<br />$ -
<br />$ 1,689.75
<br />Niemela Design and Construction
<br />09-9250
<br />9A
<br />Insulation - Labor
<br />$ 6,500.00
<br />$ -
<br />$ -
<br />$ 6,500.00
<br />$ 6,500.00
<br />$ 6,500.00
<br />100.00%
<br />$ -
<br />$ 325.00
<br />Niemela Design and Construction
<br />09-9250
<br />9A
<br />Drywall- Labor
<br />$ 22,810.00
<br />$ -
<br />$ -
<br />$ 22,810.00
<br />$ 22,710.00
<br />$ 22,710.00
<br />99.56%
<br />$ 100.00
<br />$ 1,135.50
<br />Niemela Design and Construction
<br />09-9250
<br />9A
<br />Taping/Finishing- Labor
<br />$ 23,301.00
<br />$ -
<br />$ -
<br />$ 23,301.00
<br />$ 23,151.00
<br />$ 23,151.00
<br />99.36%
<br />$ 150.00
<br />$ 1,157.55
<br />Niemela Design and Construction
<br />09-9250
<br />9A
<br />Sealants/Acoustical- Labor
<br />$ 3,000.00
<br />$ -
<br />$ -
<br />$ 3,000.00
<br />$ 3,000.00
<br />$ 3,000.00
<br />100.00%
<br />$ -
<br />$ 150.00
<br />Niemela Design and Construction
<br />09-9250
<br />9A
<br />FRP - Labor
<br />$ 630.00
<br />$ -
<br />$ -
<br />$ 630.00
<br />$ 630.00
<br />$ 630.00
<br />100.00%
<br />$ -
<br />$ 31.50
<br />Niemela Design and Construction
<br />09-9250
<br />9A
<br />Equipment- Lift
<br />$ 7,500.00
<br />$ -
<br />$ -
<br />$ 7,500.00
<br />$ 7,500.00
<br />$ 7,500.00
<br />100.00%
<br />$ -
<br />$ 375.00
<br />Niemela Design and Construction
<br />09-9250
<br />9A
<br />Mobilization
<br />$ 5,000.00
<br />$ -
<br />$ -
<br />$ 5,000.00
<br />$ 5,000.00
<br />$ 5,000.00
<br />100.00%
<br />$ -
<br />$ 250.00
<br />Niemela Design and Construction
<br />09-9250
<br />9A
<br />Bonding
<br />$ 2,915.00
<br />$ -
<br />$ -
<br />$ 2,915.00
<br />$ 2,915.00
<br />$ 2,915.00
<br />100.00%
<br />$ -
<br />$ 145.75
<br />Niemela Design and Construction
<br />09-9250
<br />9A
<br />Allowance (Terra Directed)
<br />$ 5,000.00
<br />$ -
<br />$ -
<br />$ 5,000.00
<br />$ -
<br />$ -
<br />0.00%
<br />$ 5,000.00
<br />$ -
<br />Niemela Design and Construction
<br />09-9250
<br />9A
<br />Allowance -Access Panels
<br />$ 2,000.00
<br />$ -
<br />$ -
<br />$ 2,000.00
<br />$ -
<br />$ -
<br />0.00%
<br />$ 2,000.00
<br />$ -
<br />Niemela Design and Construction
<br />09-9250
<br />9A
<br />CO#1 PR#2R Clerestory Head Detail
<br />$ -
<br />$
<br />$ 4,963.35
<br />$ 4,963.35
<br />$ 4,963.35
<br />$ 4,963.35
<br />100.00%
<br />$ -
<br />$ 248.17
<br />Niemela Design and Construction
<br />09-9250
<br />9A
<br />CO#2 PR#3R
<br />$ -
<br />$ -
<br />$ (357.00)
<br />$ (357.00)
<br />$ (357.00)
<br />$ (357.00)
<br />100.00%
<br />$ -
<br />$ (17.85)
<br />Niemela Design and Construction
<br />09-9250
<br />9A
<br />CO#3 ASI#9 Soffit Revisions
<br />$ -
<br />$
<br />$ 295.00
<br />$ 295.00
<br />$ 295.00
<br />$ 295.00
<br />100.00%
<br />$ -
<br />$ 14.75
<br />Niemela Design and Construction
<br />09-9250
<br />9A
<br />CO#4 RFI#107
<br />$ -
<br />$ -
<br />$ 213.00
<br />$ 213.00
<br />$ 213.00
<br />$ 213.00
<br />100.00%
<br />$ -
<br />$ 10.65
<br />Niemela Design and Construction
<br />09-9250
<br />9A
<br />CO#5 RFI#100
<br />$ -
<br />$ -
<br />$ 433.00
<br />$ 433.00
<br />$ 433.00
<br />$ 433.00
<br />100.00%
<br />$ -
<br />$ 21.65
<br />Page 4 / 10