Laserfiche WebLink
TarERoiv NumberStatic 05 <br />m Terra 0 k River Fire&ati on #3 <br />G O N S T R UCTI ON City of Elk River <br />CONTINUATION SHEET AIA DOCUMENTG703 <br />AIA Document G702, APPLICATION AND CERTIFICATION FOR PAYMENT, containing APPLICATION NO: 15 <br />Contractor's signed certification is attached. APPLICATION DATE: 4/30/22 <br />In tabulations below, amounts are stated to the nearest dollar. PERIOD TO: 4/30/22 <br />Use Column I on Contracts where variable retainage for line items may apply. <br />A <br />A.1 <br />B <br />C <br />CA <br />C.2 <br />C.3 <br />D E <br />F <br />G <br />H <br />I <br />SUBCONTRACTOR <br />ITEM <br />BID <br />DESCRIPTION OF WORK <br />SCHEDULED <br />CHANGE <br />BUDGET <br />REVISED <br />WORK COMPLETED <br />MATERIALS <br />TOTAL <br />% <br />BALANCE <br />RETAINAGE <br />VENDOR <br />NO. <br />PACK <br />VALUE <br />ORDERS <br />REVISION/ <br />SCHEDULED <br />PRESENTLY <br />COMPLETED <br />(G+C) <br />TO FINISH <br />(IF VARIABLE <br />FROM PREVIOUS <br />THIS PERIOD <br />EMPLOYEE <br />NO. <br />CONTINGENCY <br />VALUE <br />APPLICATION <br />STORED <br />AND STORED <br />(C -G) <br />RATE) <br />COST <br />TRANSFER <br />(D+E) <br />(NOT IN <br />TO DATE <br />CODE <br />D OR E) <br />(D+E+F) <br />Camco Construction <br />04-4200 <br />4A <br />Masonry-CMU Labor <br />$ 251,000.00 <br />$ - <br />$ - <br />$ 251,000.00 <br />$ 251,000.00 <br />$ 251,000.00 <br />100.00% <br />$ - <br />$ 12,550.00 <br />Camco Construction <br />04-4200 <br />4A <br />CO#1 ASI#5 Added 4'' Block <br />$ - <br />$ - <br />$ 7,661.00 <br />$ 7,661.00 <br />$ 7,661.00 <br />$ 7,.J..00 <br />100.00% <br />$ - <br />$ 363.05 <br />Camco Construction <br />04-4200 <br />4A <br />CO#2 Century Fence - Temp Fence Replacement from Delivery <br />$ - <br />$ - <br />$ (1,977.19) <br />$ (1,977.19) <br />$ - <br />$ (1,977.19) <br />$ (1,977.19) <br />100.00% <br />$ - <br />$ (98.86) <br />Camco Construction <br />04-4200 <br />4A <br />CO#3 Added CMU at Sill of S3 per RFI#96 <br />$ - <br />$ - <br />$ 1,655.00 <br />$ 1,655.00 <br />$ - <br />$ 1,655.00 <br />$ 1,655.00 <br />100.00% <br />$ - <br />$ 82.75 <br />Camco Construction <br />04-4200 <br />4A <br />CO#4 RFI#150 <br />$ - <br />$ - <br />$ (678.00) <br />$ (678.00) <br />$ - <br />$ (678.00) <br />$ (678.00) <br />100.00% <br />$ - <br />$ (33.90) <br />Camco Construction <br />04-4200 <br />4A <br />CO#5 Physical Training Duct Work Patch (From PSM) <br />$ - <br />$ - <br />$ 744.50 <br />$ 744.50 <br />$ - <br />$ 744.50 <br />$ 744.50 <br />100.00% <br />$ - <br />$ 37.23 <br />Camco Construction <br />04-4200 <br />4A <br />CO#6 RFI#201 Door Frame 106 Reinstall (To MCD) <br />$ - <br />$ - <br />$ (740.00) <br />$ (740.00) <br />$ - <br />$ (740.00) <br />$ (740.00) <br />100.00% <br />$ - <br />$ (37.00) <br />Camco Construction <br />04-4200 <br />4A <br />CO#7 RFI#201 Bondo and Re -Install Door 106 (To Century) <br />$ - <br />$ - <br />$ (479.27) <br />$ (479.27) <br />$ - <br />$ (479.27) <br />$ (479.27) <br />100.00% <br />$ - <br />$ (23.96) <br />Camco Construction <br />04-4200 <br />4A <br />CO#B RFI#201 Repaainting Door Frame 106 (To Steinbrecher) <br />$ - <br />$ - <br />$ (717.00) <br />$ (717.00) <br />$ - <br />$ (717.00) <br />$ (717.00) <br />100.00% <br />$ - <br />$ (35.85) <br />Distinctive Iron <br />05-5120 <br />5A <br />Structural Steel Material-Startup/Shop Drawings <br />$ 38,200.00 <br />$ - <br />$ - <br />$ 38,200.00 <br />$ 38,200.00 <br />$ 38,200.00 <br />100.00% <br />$ - <br />$ 1,910.00 <br />Distinctive Iron <br />05-5120 <br />5A <br />Structural Steel -Material <br />$ 75,000.00 <br />$ - <br />$ - <br />$ 75,000.00 <br />$ 75,000.00 <br />$ 75,000.00 <br />100.00% <br />$ - <br />$ 3,750.00 <br />Distinctive Iron <br />05-5120 <br />5A <br />Steel Material-Joist/Deck <br />$ 115,553.75 <br />$ - <br />$ 87,196.25 <br />$ 202,750.00 <br />$ 202,750.00 <br />$ 202,750.00 <br />100.00% <br />$ - <br />$ 10,137.50 <br />Distinctive Iron <br />05-5120 <br />5A <br />Steel Material-Misc <br />$ 67,006.25 <br />$ - <br />$ - <br />$ 67,006.25 <br />$ 67,006.25 <br />$ 67,006.25 <br />100.00% <br />$ - <br />$ 3,350.31 <br />Distinctive Iron <br />05-5120 <br />5A <br />CO#1 Salvaged Steel Bollards <br />$ - <br />$ - <br />$ (1,232.00) <br />$ (1,232.00) <br />$ (1,232.00) <br />$ (1,232.00) <br />100.00% <br />$ - <br />$ (61.60) <br />Distinctive Iron <br />05-5120 <br />5A <br />CO#2 Increased RTU Loads <br />$ - <br />$ - <br />$ 1,305.28 <br />$ 1,305.28 <br />$ 1,305.28 <br />$ 1,305.28 <br />100.00% <br />$ - <br />$ 65.26 <br />Distinctive Iron <br />05-5120 <br />5A <br />CO#3 RFI#54 WS Beam Connections <br />$ - <br />$ - <br />$ 1,406.22 <br />$ 1,406.22 <br />$ 1,406.22 <br />$ 1,406.22 <br />100.00% <br />$ - <br />$ 70.31 <br />Distinctive Iron <br />05-5120 <br />5A <br />CO#4 RFI#46 Trench Drain Grates <br />$ - <br />$ - <br />$ 415.34 <br />$ 415.34 <br />$ 415.34 <br />$ 415.34 <br />100.00% <br />$ - <br />$ 20.77 <br />Distinctive Iron <br />05-5120 <br />5A <br />CO#5 Predrilling Sill Angles for Centuryto Install <br />$ - <br />$ - <br />$ 676.41 <br />$ 676.41 <br />$ 676.41 <br />$ 676.41 <br />100.00% <br />$ - <br />$ 33.62 <br />Distinctive Iron <br />05-5120 <br />5A <br />CO#6 RFI#69 Removal of 6x4x1/4'' Angle At OH App Doors <br />$ - <br />$ <br />$ (2,038.93) <br />$ (2,038.93) <br />$ (2,038.93) <br />$ (2,038.93) <br />100.00% <br />$ - <br />$ (101.95) <br />Distinctive Iron <br />05-5120 <br />5A <br />CO#7 ASI#BR Roof Transitions <br />$ - <br />$ - <br />$ 6,193.52 <br />$ 6,193.52 <br />$ 6,193.52 <br />$ 6,193.52 <br />100.00% <br />$ - <br />$ 309.66 <br />Distinctive Iron <br />05-5120 <br />5A <br />CO#B DI Pre Drilling <br />$ - <br />$ - <br />$ 466.54 <br />$ 466.54 <br />$ 466.54 <br />$ 466.54 <br />100.00% <br />$ - <br />$ 23.43 <br />Distinctive Iron <br />05-5120 <br />5A <br />CO#9 COR#37 Added 2 Loose Lintels <br />$ - <br />$ - <br />$ 512.65 <br />$ 512.65 <br />$ 512.65 <br />$ 512.65 <br />100.00% <br />$ - <br />$ 25.63 <br />Distinctive Iron <br />05-5120 <br />5A <br />CO#10 COR#36R Added Steel <br />$ - <br />$ - <br />$ 3,702.44 <br />$ 3,702.44 <br />$ 3,702.44 <br />$ 3,702.44 <br />100.00% <br />$ - <br />$ 165.12 <br />Distinctive Iron <br />05-5120 <br />5A <br />CO#11 RFI#103 Angles Above W1 Windows <br />$ - <br />$ - <br />$ 1,062.67 <br />$ 1,062.67 <br />$ 1,062.67 <br />$ 1,062.67 <br />100.00% <br />$ - <br />$ 53.13 <br />Distinctive Iron <br />05-5120 <br />5A <br />CO#12 RFI#109 <br />$ - <br />$ - <br />$ (212.00) <br />$ (212.00) <br />$ (212.00) <br />$ (212.00) <br />100.00% <br />$ - <br />$ (10.60) <br />Distinctive Iron <br />05-5120 <br />5A <br />CO#13 RFI#100 <br />$ - <br />$ - <br />$ 2,775.64 <br />$ 2,775.64 <br />$ - <br />$ - <br />0.00% <br />$ 2,775.64 <br />$ - <br />Distinctive Iron <br />05-5120 <br />5A <br />CO#14 Replacement MC6x12 <br />$ - <br />$ - <br />$ 2,135.02 <br />$ 2,135.02 <br />$ 2,135.02 <br />$ 2,135.02 <br />100.00% <br />$ - <br />$ 106.75 <br />Distinctive Iron <br />05-5120 <br />5A <br />CO#15 Supportfor P3At App Bay <br />$ - <br />$ - <br />$ (212.00) <br />$ (212.00) <br />$ - <br />$ - <br />0.00% <br />$ (212.00) <br />$ - <br />Distinctive Iron <br />05-5120 <br />5A <br />CO#16 RFI#156Angle Iron Material <br />$ - <br />$ - <br />$ 1,203.29 <br />$ 1,203.29 <br />$ - <br />$ - <br />0.00% <br />$ 1,203.29 <br />$ <br />Distinctive Iron <br />05-5120 <br />5A <br />CO#17 Added Steel Plate at Training Tower <br />$ - <br />$ - <br />$ 633.64 <br />$ 633.64 <br />$ - <br />$ - <br />0.00% <br />$ 633.64 <br />$ - <br />Patriot Erectors <br />05-5121 <br />5B <br />Structural Steel Erection <br />$ 58,000.00 <br />$ - <br />$ - <br />$ 58,000.00 <br />$ 58,000.00 <br />$ 58,000.00 <br />100.00% <br />$ - <br />$ 2,900.00 <br />Patriot Erectors <br />05-5121 <br />5B <br />Joists & Decking <br />$ 29,575.00 <br />$ - <br />$ - <br />$ 29,575.00 <br />$ 29,575.00 <br />$ 29,575.00 <br />100.00% <br />$ - <br />$ 1,478.75 <br />Patriot Erectors <br />05-5121 <br />5B <br />Metal Fabrications <br />$ 26,175.00 <br />$ - <br />$ - <br />$ 26,175.00 <br />$ 25,175.00 <br />$ 1,000.00 <br />$ 26,175.00 <br />100.00% <br />$ - <br />$ 1,308.75 <br />Patriot Erectors <br />05-5121 <br />5B <br />Bond <br />$ 4,000.00 <br />$ - <br />$ - <br />$ 4,000.00 <br />$ 4,000.00 <br />$ 4,000.00 <br />100.00% <br />$ - <br />$ 200.00 <br />Patriot Erectors <br />05-5121 <br />5B <br />CO#1 PR#2R Clerestory Head Detail <br />$ - <br />$ - <br />$ 6,784.00 <br />$ 6,784.00 <br />$ 6,784.00 <br />$ 6,784.00 <br />100.00% <br />$ - <br />$ 339.20 <br />Patriot Erectors <br />05-5121 <br />5B <br />CO#2 LT GA 3x3 Cavity Closure Angle Install <br />$ - <br />$ - <br />$ 1,272.00 <br />$ 1,272.00 <br />$ 1,272.00 <br />$ 1,272.00 <br />100.00% <br />$ - <br />$ 63.60 <br />Patriot Erectors <br />05-5121 <br />5B <br />CO#3 RFI#69 Removal of angle at App Doors <br />$ - <br />$ - <br />$ (1,060.00) <br />$ (1,060.00) <br />$ (1,060.00) <br />$ (1,060.00) <br />100.00% <br />$ - <br />$ (53.00) <br />Patriot Erectors <br />05-5121 <br />5B <br />CO#4 ASI#BR Roof Transition <br />$ - <br />$ - <br />$ 530.00 <br />$ 530.00 <br />$ 530.00 <br />$ 530.00 <br />100.00% <br />$ - <br />$ 26.50 <br />Patriot Erectors <br />05-5121 <br />5B <br />CO#5 RFI#92 Slab Edge Detail at Mezzanine Opening <br />$ - <br />$ - <br />$ 230.00 <br />$ 230.00 <br />$ 230.00 <br />$ 230.00 <br />100.00% <br />$ - <br />$ 11.50 <br />Patriot Erectors <br />05-5121 <br />5B <br />CO#6 PR#16 <br />$ - <br />$ - <br />$ 477.00 <br />$ 477.00 <br />$ 477.00 <br />$ 477.00 <br />100.00% <br />$ - <br />$ 23.65 <br />Patriot Erectors <br />05-5121 <br />5B <br />CO#7 RFI#103 Angles Above W1 Windows <br />$ - <br />$ - <br />$ 424.00 <br />$ 424.00 <br />$ 424.00 <br />$ 424.00 <br />100.00% <br />$ - <br />$ 21.20 <br />Patriot Erectors <br />05-5121 <br />5B <br />CO#B RFI#109 <br />$ - <br />$ - <br />$ 212.00 <br />$ 212.00 <br />$ 212.00 <br />$ 212.00 <br />100.009 <br />$ - <br />$ 10.60 <br />Patriot Erectors <br />05-5121 <br />5B <br />CO#9 RFI#100 <br />$ - <br />$ - <br />$ 742.00 <br />$ 742.00 <br />$ 742.00 <br />$ 742.00 <br />100.00% <br />$ - <br />$ 37.10 <br />Patriot Erectors <br />05-5121 <br />5B <br />CO#10 RFI #101 <br />$ - <br />$ - <br />$ 212.00 <br />$ 212.00 <br />$ 212.00 <br />$ 212.00 <br />100.009 <br />$ - <br />$ 10.60 <br />Patriot Erectors <br />05-5121 <br />5B <br />CO#11 RFI#156 Additional Angle Iron for Fan <br />$ - <br />$ - <br />$ 1,612.00 <br />$ 1,612.00 <br />$ 1,612.00 <br />$ 1,612.00 <br />100.00% <br />$ - <br />$ 60.60 <br />Patriot Erectors <br />05-5121 <br />5B <br />CO#12 RFI#159 Training Tower Welding <br />$ - <br />$ - <br />$ 424.00 <br />$ 424.00 <br />$ 424.00 <br />$ 424.00 <br />100.00% <br />$ - <br />$ 21.20 <br />Page 2 / 10 <br />