Laserfiche WebLink
<br />Page 5 <br /> <br />. <br /> <br />Cliff - Then Gerry your saying you will be taking care of this whole hill, <br />and realistically we will not have to go through each one. The one thing <br />that we are looking at is a deadline of October 1st because in order for <br />this to work we have to get something established which will be a highway <br />mix or also the blanketing etc. So 3, 4 & 5 is - anybody own Lot 4, Block <br />12. <br /> <br />Jim Rooney, Fine Line Hom~s indicated Yes, I do. <br /> <br />Cliff - Do you have any problems with the corrections or anything? <br /> <br />Mr. Rooney stated that he did not know what the corrections were. <br /> <br />Cliff asked him to step up to the table to look at the corrections. What he <br />is proposing is silt fencing, 4 to 1 slopes, two retaining walls coming down <br />to the property lines. Its going to be a step process coming down. <br /> <br />Mr. Rooney asked what is it going to be from the existing elevation then? <br /> <br />Cliff stated that he is showing, the way it is right now, we have a 956 <br />elevation, it will be 2 ft. higher in the back. It will be 6 ft higher <br />here so 964 we'll have more of a gradual slope. What he is doing is taking <br />the hill and pushing it out further so he can achieve the 4 to 1 slopes. <br /> <br />. Rooney - So its going to raise up. <br /> <br />Cliff - This is showing the elevations of 962 for the garage and 962 around <br />the house and basement of 955 and that can be changed also through the split <br />entries and so on. He's proposing a 8.8% driveway which is in compliance <br />with our ordinance maximum 10% slope. <br /> <br />r <br /> <br />Mr. Rooney - So were going to have to put some fill on there, kind of what <br />it amounts to. <br /> <br />Cliff- According to Jerry he was going to take care of the fill and every <br />thing on there. <br /> <br />Gerry - If it needs fill, we will take care of it. I don't thing its going <br />to need fill, but if it does were going to take care of it. <br /> <br />Steve Rohlf - According to these plans it will need fill. <br /> <br />Cliff- Its showing about 6 ft. in the back here with fill. <br /> <br />Rooney - is that going to be compacted then or are we going to have to bury <br />some extra blocks. <br /> <br />Jerry Smith- by the time you dig your basement there will be some coming out <br />of the basement. <br /> <br />. <br /> <br />Rooney - I'm concerned about having to bury some extra blocks. I thing it <br />will be costly. <br />