Laserfiche WebLink
<br />Page 6 <br /> <br />. <br /> <br />Jerry Smith - I think we had better take a better look at that because I <br />have not had a change to visit with you. <br /> <br />Steve Rohlf - On lot 4 who is doing the silt fences, retaining wall and fill <br />or whatever is need. Rooney - Gerry is. <br /> <br />Gerry - I'm not sure it needs fill - I haven't looked at Lot 4 that close. <br /> <br />Cliff- why don't you come up here and look at the plans. <br /> <br />Jerry - By the time we get those basement dug up there should not be any <br />fill needed. The way I was explained this was going to work because this is <br />a tuck under here and on 3 there is going to be dirt coming out of the <br />tuck-under there is going to be plenty of dirt left over so on lot 4. I'm <br />not going to make a statement were going to furnish dirt until I absolutely <br />know how much were going to need. <br /> <br />Steve -These are the plans you submitted. <br /> <br />Cliff these are the plans that show the elevations and this is basically <br />what were going to be coming off of. <br /> <br />. <br /> <br />Gerry - I have not had a chance to get together with you on this. We have <br />agreed to take care of the hill...this is the hill. <br /> <br />Cliff - While this is still also because of the erosion. In order to achieve <br />this 4 to 1 all of these are part of it. <br /> <br />Gerry - If it needs some fill back here to achieve it, then we will put it <br />in there...if its going to take some fill, I don't think it will. <br /> <br />Steve are you unfamiliar with your plans? <br /> <br />Gerry - I have not had a chance to go over 4. <br /> <br />Steve - These were submitted for the corrections. <br /> <br />Gerry - I've gone over 14, and 3. This one I have not gone over. I think <br />what we can agree on is that I will take care of this hill if it is needed. <br /> <br />Cliff - O.K. <br /> <br />Gerry - I agree to all the retaining walls on Lot 3 and 4 and on the <br />cul-de-sac, is that lot 14. <br /> <br />Cliff - Basically the erosion control which is shown. <br /> <br />Steve- Why don't you explain about the plans that we had. Gerry Smith <br />submi tted them and we were reviewing them to see if they were adequate and <br />. this is what were going to require on here once we approve them. <br /> <br />Cliff - What it boils down to we were trying to get corrections from Gerry <br />Smith. Throughout the process this was the fifth one, this plan were' <br />approved by the City, Gerry has achieved our 4 to 1 slopes, and he did it <br />