Laserfiche WebLink
Orono/New Look Change Orders <br />PR# I <br />Change <br /># <br />Date <br />Brief Description <br />Total Cost <br />001 <br />1 <br />5/28 <br />Temporary construction fencing (play area, splash pad, boat launch) <br />$7,500 <br />2 <br />5/28 <br />Boat launch, no parking signage, closed signs <br />$2,100 <br />3 <br />5/28 <br />Pickleball court fencing, fabric, and fittings <br />$12,295 <br />002 <br />1 <br />6/7 <br />NOT approved -Revise trail alignment and grading to avoid park sign <br />003 <br />1 <br />6/18 <br />Remove existing water service for farmer drinking fountain <br />$965 <br />004 <br />1/2 <br />6/22 <br />Conduit and wire alignment revisions including under Gary Street <br />$15,294.97 <br />3 <br />6/22 <br />Furnish and install conduit for solar table <br />$1,168.89 <br />005 <br />1 <br />7/15 <br />Furnish and install three card readers on bathroom doors <br />$2304.00 <br />2 <br />7/15 <br />Power supply feeds to shelters, install ground boxes <br />$5,199 <br />3 <br />NOT approved -vehicle charger conduit <br />006 <br />11 <br />7/29 <br />Two additional conduits for two cameras <br />$3,234 <br />007 <br />1 <br />. 9/13 <br />Conduit for flagpole <br />$3,415 <br />9/13 <br />Skatepark conduit for future lighting <br />$3,785 <br />008 <br />1 <br />10/15 <br />Flagpole Installation- Flag runners' contribution $4,400.00 <br />Reconstruct trail connection to fishing pier on existing aggregate _ <br />Remove existing bituminous trail connection to existing shelter and replace with six -inch -thick <br />concrete walk <br />Total <br />$14,264.23 <br />$7,593.44 <br />009 <br />10/25 <br />10/25 <br />$79,118.53 <br />