Laserfiche WebLink
MN/Wisconsin Playground Change Orders <br />PR # Change # Date Brief Description _ Total Cost <br />001 1 9/24 Toilet Shelter building, shelter doors and hardware $2,623.85 <br />2 10/24 Additional 904 sf concrete @ six inches $9,012 <br />Total $11,635.85 <br />Spohn Ranch Change Orders <br />PR# Change# Date Brief Description Total Cost <br />11/10 Steinbrecher Demo yard boxes for Spohn Ranch $2,966.35 <br />Total $2966.35 <br />PR# <br />Updated 12/1/21 <br />Other <br />Date Brief Description <br />11/30 ERMU Commercial water connection and meter <br />Total Cost <br />$4,480.75 <br />Total $4,480.75 <br />