My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.1. PCSR 08-24-2021
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2021-2030
>
2021
>
08-24-2021
>
5.1. PCSR 08-24-2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2021 10:16:43 AM
Creation date
8/20/2021 9:23:13 AM
Metadata
Fields
Template:
City Government
type
PCSR
date
8/24/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
177
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1` <br /> Riv " - <br /> _ �IIr2 <br /> - 1 <br /> How will Highway 10 be"Redefined"? Coordinate with the City of Ramsey <br /> As the southeast Elk River area continues to develop with a Planning studies have been completed and are ongoing <br /> mix of uses including highway business,business park,and east of Elk River in Anoka County.The City of Ramsey has <br /> industrial,greater demands will be placed on the Highway conducted significant planning studies for Highway 10, <br /> 10 corridor for access and service to development. The with involvement from MnDOT,Anoka County,and partic- <br /> segment of the roadway in Elk River that is east of Highway ipation from Elk River. Studies completed in 2015 and <br /> 169 will be a subject of significant scrutiny from MnDOT 2019 resulted in identifying steps for the improvement of <br /> and other transportation partners in coming years to mobility on Highway 10 in Ramsey.In general,the highway <br /> ensure the corridor is able to serve both local and regional is on the path toward becoming a freeway facility. <br /> travel needs.As such,it will be essential for City officials <br /> to review any new development proposals along this The City of Elk River should coordinate with the City of <br /> segment of the Highway 10 corridor that may potentially Ramsey to ensure plans and potential modifications to <br /> impact travel and/or add to congestion.In anticipation of Highway 10 align with the future land use development <br /> multi-agency concerns about the Highway 10 corridor, plan for this area of Elk River. <br /> Elk River should take a proactive approach to evaluating <br /> future growth scenarios and options for managing access <br /> to Highway 10.Current plans for the Highway 10 corridor <br /> include the establishment of two interchange locations <br /> east of Highway 169:the new Twin Lakes Road corridor and <br /> at the eastern border of Elk River in the vicinity of Jarvis or <br /> Adams Streets. <br /> Mainline Cross-Sections <br /> A—1 WMI <br /> Highway 10 Preliminary Design and Environmental Documentation,SRF Consulting Group Inc and MNDOT <br /> 84 Transportation&Mobility Plan Elk River Comprehensive Plan <br /> DRAFT FOR REVIEW ONLY <br />
The URL can be used to link to this page
Your browser does not support the video tag.