My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.1. PCSR 08-24-2021
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2021-2030
>
2021
>
08-24-2021
>
5.1. PCSR 08-24-2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2021 10:16:43 AM
Creation date
8/20/2021 9:23:13 AM
Metadata
Fields
Template:
City Government
type
PCSR
date
8/24/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
177
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Develo East-West and <br /> Northlouth Connections <br /> Through the Community 32 <br /> The community's roadway network is currently 169 <br /> constrained by a lack of connectivity.While the City land ,z, <br /> mass is oriented in a north-south manner,most of the J <br /> development within Elk River is oriented east-west and �\ <br /> divided by high volume roadways(Highway 169 and <br /> Highway 10).To make matters more challenging,the ' I \� t 33 s <br /> growth of Elk River's transportation network occurred in 33 <br /> a generally piecemeal fashion,concurrent with devel- <br /> opment.This resulted in a built environment that offers <br /> limited options for continuous local routes across the City, I <br /> frustrating drivers and extending commuter times. <br /> 44 <br /> 40 <br /> CSAH 33 Corridor71 <br /> �— <br /> The 169 Redefine project will provide some relief by elimi- <br /> nating at-grade crossings within Elk River.Another option �� �.. 3 <br /> � <br /> to enhance east-west ties include realigning segments ,-. 'Z'.of current CSAR 33.With potential realignments of that <br /> roadway occurring on either side of Highway 169,the CSAR 101` J <br /> \" F <br /> 33 corridor has the potential to become a high-demand \� <br /> east-west route across northern Elk River.With future Roadway Realignment <br /> growth in Elk River,the CSAR 33 corridor is likely to be <br /> reclassified from a collector street to a minor arterial route. PC)eri ial Roadway <br /> Realignment Opportunities 10 <br /> Twin Lakes Road <br /> Similarly,other areas of growth in Elk River,such as the <br /> eastern side of the City,will create opportunities for estab- <br /> lishing clear north-south travel corridors.The 2019 study <br /> of Twin Lakes Road(CSAR 33,a minor arterial route)by <br /> Sherburne County sheds light on the methods necessary School Street Corridor <br /> to preserve that asset.The Twin Lakes Road(CSAR 13) Construction of the interchange at School Street and <br /> corridor has several improvements identified for it,along Highway 169 makes this node a natural consideration for <br /> with the realignment of a portion near Highway 10 that addressing east-west connections in Elk River.Given the <br /> would be supportive of a better-spaced network for access prominence of School Street west of Highway 169,a new <br /> and future creation of a highway interchange. evaluation of opportunities to extend the corridor to the <br /> east(to Twin Lakes Road)should be considered. <br /> Filmore to Jarvis Connection <br /> As part of relieving pressure on Twin Lakes Road,oppor- Planned Street Improvements <br /> tunities to further enhance north-south travel should Local street corridor improvements should also be made <br /> be considered such as the potential connection between as growth occurs.For instance,a new connection between <br /> Filmore Street and Jarvis Street.While those are currently Twin Lakes Road and County Road 40(Cleveland Road) <br /> municipal streets,such a connection would likely require is planned.Similarly,a new 5th Street connection from <br /> coordination with Sherburne County for conversion to a Dodge Street to Twin Lakes Road is planned.This will <br /> county road. improve local travel patterns by creating a cul-de-sac <br /> on Line Avenue and preventing"cut through"trips that <br /> attempt to short cut through residential areas. <br /> Elk River Comprehensive Plan•Transportation&Mobility Plan 83 <br /> DRAFT FOR REVIEW ONLY <br />
The URL can be used to link to this page
Your browser does not support the video tag.