My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.5. SR 06-07-2021
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2021
>
06-07-2021
>
4.5. SR 06-07-2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2021 9:39:35 AM
Creation date
6/4/2021 8:04:23 AM
Metadata
Fields
Template:
City Government
type
SR
date
6/7/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHANGE ORDER <br />No. 1 <br />PROJECT: 2021 Street Improvements Project <br />DATE OF ISSUANCE: <br />OWNER: City of Elk River <br />ENGINEER'S Project No.: R13.121582 <br />CONTRACTOR: North Valley, Inc. <br />EFFECTIVE DATE: <br />ENGINEER: Bolton & Menk, Inc. <br />You are directed to make the following changes in the Contract Documents. <br />Description: <br />CO 1.1— Watermain Valve & Structure Chimney Seal Modification <br />1. ADD the attached pay items as CO- 1.1 at the unit prices listed to the contract documents: <br />CO 1.1—Watermain Valve & Structure Chimney Seal Modification- Construction Cost = $75,134.72 <br />CO 1.2 — Woodland Trails Park Improvements <br />1. ADD the attached pay items as CO-1.2 at the unit prices listed to the contract documents: <br />CO 1.2 —Woodland Trails Park Improvements- Construction Cost = $130,515.27 <br />CO 1.3 — Twin Lakes Road Turn Lane Modification <br />1. ADD the attached pay items as CO-1.3 at the unit prices listed to the contract documents: <br />CO 1.3 — Twin Lakes Road Turn Lane Modification- Construction Cost = $60,500.42 <br />CO 1— Specification <br />1. ADD the attached specification items to the contract documents. <br />CO 1— Plan Sheets <br />1. ADD the attached revised plan sheets to the contract documents. <br />Reason for Change Order: <br />CO 1.1— Watermain Valve & Structure Chimney Seal Modification: ERMU has indicated that some of the project <br />impacted valve boxes should be replaced and that an unused watermain valve shall be cut out and the main capped. The <br />impacted gate valves & boxes are on Jackson Avenue NW, 1791' Avenue NW, Zane Street NW, Industrial Circle NW, 171St <br />Avenue NW, and Twin Lakes Road NW. Exterior pipe grout repair will be performed on a catch basin on the northwest <br />quadrant of Jackson Avenue NW and 1901h Avenue NW. <br />All project impacted manholes and catch basins will be fitted with a chimney seal to reduce water infiltration. <br />The pay items in CO- 1.1 are needed to complete these modifications. The attached unit prices are hereby approved in the <br />total amount of $75,134.72. <br />CO 1.2 Woodland Trails Park Improvements: The City intends to install a 10' wide bituminous trail the walk on the east <br />side of Elk Lake Road NW to an existing trail within the Woodland Trails Park. This project also includes a 1.5" overlay <br />on the park access road and a 1.5" mill & overlay on the parking lot. <br />The pay items in CO-1.2 are needed to complete this project. The attached unit prices are hereby approved in the total <br />amount of $130,515.27. <br />
The URL can be used to link to this page
Your browser does not support the video tag.