My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.5. SR 06-07-2021
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2021
>
06-07-2021
>
4.5. SR 06-07-2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2021 9:39:35 AM
Creation date
6/4/2021 8:04:23 AM
Metadata
Fields
Template:
City Government
type
SR
date
6/7/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CO 1.3 Twin Lakes Road Turn Lane Modification: The City intends to remove three turn lanes on Twin Lakes Road <br />that do not serve connection roads or driveways. Two of these turn lanes are located approximately 700-feet north of 172" <br />Avenue NW on Twin Lakes Road NW and one of these turn lanes is located at the southern intersection (Southbound <br />Travel Way) of Industrial Boulevard NW and Twin Lakes Road NW. There are no plans to construct improvements that <br />will utilize these turn lanes. <br />The pay items in CO-1.3 are needed to complete these modifications. The attached unit prices are hereby approved in the <br />total amount of $60,500.42. <br />Attachments: 1) CO- 1.1 Schedule of Unit Prices <br />2) CO-1.2 Schedule of Unit Prices <br />3) CO- 1.3 Schedule of Unit Prices <br />4) Specification Items <br />5) Revised Plan Sheets <br />CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: <br />Original Contract Price Original Contract Times <br />Ready for final payment: November 19, 2021 <br />Net Increase of this Change Order Net Increase of this Change Order 0 days <br />CO-1.1 $75,134.72 <br />CO-1.2 $130,515.27 <br />CO-1.3 $60,500.42 <br />Total = $266,150.42 <br />Contract Price with all approved <br />Change Orders <br />$5,030,182.65 <br />RECOMMENDED: <br />By: <br />Engineer (Authorized Signature) <br />Date: 5/24/2021 <br />Contract Times with all approved Change Orders <br />Ready for final payment: <br />APPROVED: <br />By: <br />Owner (Authorized Signature) <br />Date: <br />November 19, 2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.