My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.5. SR 06-07-2021
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2021
>
06-07-2021
>
4.5. SR 06-07-2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2021 9:39:35 AM
Creation date
6/4/2021 8:04:23 AM
Metadata
Fields
Template:
City Government
type
SR
date
6/7/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CCI—1— Specification Modifications <br />2021 Street Improvements <br />City of Elk River, MN <br />R13.121582 <br />SAP 204-104-008, SAP 204-118-001, SAP 204-132-005, SAP 204-133-006, SAP 204-136-001, <br />SAP 204-144-001, SAP 204-146-001, SAP 204-156-001 <br />Add to Section 02220 (REMOVING PAVEMENT AND MISCELLANEOUS STRUCTURES), Part <br />1.2.A: <br />6. Payment for Remove Gate Valve & Box shall be paid at the contract price per Each (EA), <br />which shall be payment in full for all costs of labor, materials, and equipment to locate, <br />and remove gate valve & box. Also included in the price is all associated backfill, class 5 <br />aggregate base, bituminous patching, and all other necessary work. <br />7. Payment for 10" Pipe Plug shall be paid at the contract price per Each (EA), which shall be <br />payment in full for all costs of labor, materials, and equipment to remove and cap <br />watermain and all other associated necessary work. <br />Add to Section 02630 (PIPE SEWERS — STORM), Part 1.2.A: <br />7. Payment for Exterior Pipe Grout Repair shall be paid at the contract price per Each (EA), <br />which shall be payment in full for all costs of labor, materials, and equipment to fully <br />expose the designated structure and pipes, grout the structure as designated by the <br />engineer, backfill the structure and pipe, and all other associated necessary work. <br />Remove and Replace Section 02530 (PIPE SEWERS — SANITARY), Part 1.2.A.3 with: <br />3. Seal Drainage Structure (Manhole Chimney Seal) <br />Remove and Replace Section 02630 (PIPE SEWERS — STORM) Part 1.2.A.3 with: <br />3. Seal Drainage Structure (Manhole Chimney Seal) or Seal Drainage Structure (Catch Basin <br />Chimney Seal) <br />Remove and Replace Section 02530 (PIPE SEWERS — SANITARY), Part 1.2.A.3.a with: <br />(a) Payment for Seal Drainage Structure (Manhole Chimney Seal) shall be paid at the contract <br />price per Each (EA), which shall be payment in full for all costs of labor, materials, and <br />equipment to install chimney seals on structures designated by the Engineer. <br />Page 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.