My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.3 SR 05-17-2021
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2021
>
05-17-2021
>
4.3 SR 05-17-2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2021 4:22:15 PM
Creation date
5/14/2021 9:57:35 AM
Metadata
Fields
Template:
City Government
type
SR
date
5/17/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Justin Femrite, Public Works Director <br />March 11, 2021 <br />Page 3 <br />Deliverables: HAI will provide a hard copy and electronic copy (.pdf format) of the Preliminary Plat. <br />The Preliminary Plat will be included as a submittal item. <br />Estimated Cost: $3,600 <br />PRELINHNARY ENGINEERING SERVICES <br />HAI will prepare the preliminary engineering documents required for the preliminary plat application. <br />Specifically, we will prepare a preliminary grading plan, a preliminary street plan, and a preliminary <br />utility plan. We will provide site improvement details such as preliminary pavement typical section, <br />preliminary stormwater details, storm sewer details, pedestrian access routes, etc. <br />We will also prepare a preliminary hydrologic stormwater model and determine the size and proposed <br />grading or locations of necessary stormwater BMPs. Our stormwater design will include determining <br />pre -project vs. post -project runoff rates for the 2-year, 10-year, and 100-year design storms as required <br />by the City of Elk River. We will also consider the volume control requirements of the jurisdictional <br />agencies and propose stormwater BMPs as appropriate. Our stormwater design will be summarized in <br />a Preliminary Stormwater Management Plan and will be submitted to the City as a submittal item. <br />Additionally, we will prepare a preliminary Turn Lane design for the intersection of 1651h Avenue NW <br />and the new City Street proposed constructed with this development. <br />Deliverables: Our deliverables will be Preliminary Civil Construction Plans consisting of: Title Sheet, <br />Details, Preliminary Grading Plan, Preliminary Street Plan, Preliminary Utility Plan, Preliminary Turn <br />Lane Plan, and Preliminary Stormwater Management Plan. <br />Estimated Cost: $8,000 <br />WETLAND DELINEATION / WETLAND REVIEW <br />HAI will field delineate the wetlands (if any are present) and collect the points so that the boundary can <br />be accurately depicted on the Preliminary Plat and Construction Plans. We will prepare a Wetland <br />Delineation Report and submit it to the LGU for review and approval. If necessary, HAI will attend <br />the Technical Evaluation Panel meeting for concurrence of the wetland boundary and type. No wetland <br />impacts have been considered in this proposal. We assume that any review fees will be paid by the <br />Applicant or may be paid by HAI as a reimbursable expense at an additional cost. <br />Deliverables: Wetland Delineation Report prepared by a certified wetland delineator. <br />Estimated Cost: $2,200 <br />��Hakanson <br />Anderson <br />
The URL can be used to link to this page
Your browser does not support the video tag.