Laserfiche WebLink
City of Elk River — Elk River Fire Station 93 .A MERICAN <br />Proposal for Project Testing Services j ENGINEERING <br />AET Proposal No. 26-20557 <br />March 30, 2021 TESTING, INC. <br />Page 3 of 6 — <br />contractor. <br />Any deficiencies or deviations which are observed will be reported to the project team for correction. <br />We estimate a total of 3 site visits will be required to complete the observation of fluid applied vapor barriers <br />and EIFS. Any deficiencies or deviations which are observed will be reported to contractor and/or their <br />subcontractor. <br />Fire Stopping Material Observations <br />We will observe the installation of the fire stopping materials as they are being installed. These observations <br />will be performed by a Staff Engineer on a will -call basis. While on the site, the Engineer will: <br />Observe the installation of the firestop materials along the wall/floor joint, and the wall/ceiling joint. <br />Observe the installation of the mechanical and electrical penetration firestop materials. <br />Compare the products being installed to the details provided by the material supplier. <br />We estimate a total of 4 site visits will be required to complete the fire stopping material observations for this <br />project. Any deficiencies or deviations which are observed will be reported to contractor and/or their <br />subcontractor. <br />Masonry Observations and Testing <br />During construction, AET personnel will perform observations during masonry wall construction, as well as <br />testing of mortar and grout (if required). Our observations and testing will be performed by an experienced <br />Engineering Technician II on a will -call basis, and will include the following services: <br />• Observe that the proper size units are used. <br />• Observe that the units are clean, sound and dry when placed. <br />• Observe that the masonry bearing surfaces are clean. <br />• Observe the placement and alignment of vertical reinforcing bars and dowels, and document that the <br />correct sizes of bars are used. <br />• Observe the placement and alignment of horizontal reinforcing bars, and document that the correct <br />sizes of bars are used. <br />• Observe that the correct lengths of bar lap splices are provided. <br />• Observe that the proper clearance is provided between the bars and the masonry units. <br />• Observe the general construction practices, including compliance with proper cold or hot weather <br />protection as required by the project specifications. <br />Any discrepancies from the project specifications will be brought to the attention of the contractor and/or their <br />subcontractor. Daily field reports of our observations and testing will be available to the contractor and other <br />authorized site personnel. <br />We estimate that our technicians will make 10 site visits to conduct these observations and testing services. <br />While at the site the Engineering Technician II will also sample the mortar and grout. The grout "prism" <br />specimens will be cast for compressive strength testing according to IBC guidelines. One set of four grout <br />