Laserfiche WebLink
City of Elk River — Elk River Fire Station 93 .A MERICAN <br />Proposal for Project Testing Services j ENGINEERING <br />AET Proposal No. 26-20557 <br />March 30, 2021 TESTING, INC. <br />Page 4 of 6 — <br />"prisms" will be cast according to the testing frequency required by the project specifications. One of the <br />"prisms" will be tested for compressive strength after 7 days and two will be tested after 28 days. The fourth <br />specimen will be held for future testing, if required. <br />Observations of Welded and Bolted Connections <br />During erection of the structural steel frame, steel joists, and metal decking, AET will provide a Level II <br />Engineering Technician (AWS Certified Welding Inspector) certified in accordance with ASNT to perform <br />observations of the welded and bolted connections. These services will be performed on a will -call basis when <br />requested by the contractor. Our services will include the following: <br />• Observe bolted connections for compliance with Section 9a of the "Specification for Structural Joints <br />using ASTM: A325 or ASTM: A490 Bolts" approved by the Research Council on Structural Connections. <br />• Observe welded connections for compliance with the requirements of Section 6 (steel frame) of the AWS <br />"Structural Welding Code" D1.1. Fillet welds will be visually observed for length, quality and suitability. <br />Full or partial penetration welds will be tested by ultrasonic or magnetic particle methods. <br />• Observe deck welds for compliance with the requirements of the AWS "Structural Welding Code" D 1.3. <br />• Observe deck fasteners to verify that the correct number and spacing is provided in accordance with the <br />project specifications. <br />• Observe and test the shear stud's welds for suitability and quality in accordance with the requirements of <br />AWS "Structural Welding Code" D1.1 — Section 7. <br />Any deficiencies or deviations which are observed will be reported to personnel from the contractor and/or <br />their subcontractor. We estimate a total of 4 site visits will be required to complete our observations of the <br />welded and bolted connections on this project. Daily field reports of our observations and testing will be <br />available to the contractor and other authorized site personnel. <br />Floor Flatness Testing (Optional) <br />Floor Flatness testing may be required by the engineer if requested. These services will be performed by an <br />experienced Staff Engineer or Engineering Assistant. <br />The field testing will be completed in accordance with ASTM: El 155, "Standard Test Method of Determining <br />Floor Flatness and Levelness Using the F-number System." Our flatness/levelness testing will be performed <br />using a Face Model 2000 or 2002 dipstick We assume that we will have complete access to the slab surface <br />for this testing; i.e., no curing blankets, equipment or materials will be present or stored on the slab. <br />Bituminous Testing (Optional) <br />Upon request of the client, when placement of the bituminous base and wear layers begins, an experienced <br />Engineering Technician II would make site visits on a will -call basis to observe the placement and rolling of <br />the bituminous layers and to perform testing of the bituminous. The technician would perform the following <br />services: <br />Measure the temperature of the bituminous as it is placed and while it is being rolled. <br />Measure the thickness of the bituminous layer while it is being rolled. <br />Help to establish a rolling pattern each day by observing the number of passes the roller <br />