My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.4 SR 04-05-2021
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2021
>
04-05-2021
>
4.4 SR 04-05-2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2021 8:55:47 AM
Creation date
4/2/2021 8:20:55 AM
Metadata
Fields
Template:
City Government
type
CCM
date
4/5/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Elk River — Elk River Fire Station 93 .A MERICAN <br />Proposal for Project Testing Services j ENGINEERING <br />AET Proposal No. 26-20557 <br />March 30, 2021 TESTING, INC. <br />Page 2 of 6 — <br />Soil Observations and Testing for Building and Pavement Sub2rades: <br />• Observations of building and pavement excavations and subgrade soils (by Senior Engineering Assistant). <br />• Document elevations at the bottoms of the excavations and judge adequacy of excavation lateral <br />oversizing. <br />• Perform shallow hand auger borings and hand cone penetrometer probes to evaluate the soils in the <br />observed excavations. <br />• Observations of subgrade soils during test roll procedures (by Senior Engineering Assistant). <br />• Soil compaction tests in building and utility excavations, pavement subgrade soils (by an Engineering <br />Technician I). <br />• Standard Proctor tests of each different type of soil or Class 5 aggregate base encountered at our test <br />locations. <br />• Sieve tests of granular fill and Class 5 aggregate base materials if requested. <br />Post- Installed Anchor Observations <br />During installation of the post installed adhesive anchors, personnel from AET will observe the location, <br />placement of the anchors. While at the site, the AET personnel will perform the following services: <br />• Review the most recent plans and specifications available at the jobsite. <br />• Observe that the correct number, size, and type of anchor were installed. <br />• Document the specified adhesive was used and that the adhesive is not expired. <br />• Observe that the specified cleanout procedures were followed. <br />We estimate that our Staff Engineer I will make 2 site visits to conduct these observations and testing services. <br />Reinforcing Steel Observations and Concrete Testing: <br />• Observations of reinforcing steel in the concrete building elements to evaluate conformance to approved <br />structural drawings (by an Engineering Technician II). <br />• Field testing of concrete placed for the structural elements and other concrete features: including slump <br />tests, air content tests, and temperature tests (by an Engineering Technician I or II). <br />• Project specifications require that two sets of cylinders be cast in the first 25 cubic yards then every 50 <br />cubic yards (or fraction thereof) of each type of concrete placed each day. Each set will consist of (2) sets <br />of three cylinders; two which will be tested after 7 days and two which will be tested after 28 days. <br />• Pick up cylinders from the jobsite for delivery to AET laboratory. <br />• Compressive strength testing of concrete test cylinders (I test at 7 days; 2 tests at 28 days). <br />Observation of Fluid Applied Vapor Barrier & EIFS <br />AET has included observations of the fluid applied vapor barrier and EIFS to the exterior CMU walls in our <br />fee estimate. These services will be performed by a Staff Engineer I on a will -call basis when requested by the <br />
The URL can be used to link to this page
Your browser does not support the video tag.