Laserfiche WebLink
Number Title Date <br />§ A.3.1.4 The Sustainability Plan, if any: <br />(If the Owner identified a Sustainable Objective in the Owner's Criteria, identify the document or documents that <br />comprise the Sustainability Plan by title, date and number ofpages, and include other identifying information. The <br />Sustainability Plan identifies and describes the Sustainable Objective; the targeted Sustainable Measures; <br />implementation strategies selected to achieve the Sustainable Measures; the Owner's and Construction Manager's roles <br />and responsibilities associated with achieving the Sustainable Measures; the specific details about design reviews, testing <br />or metrics to verb achievement of each Sustainable Measure; and the Sustainability Documentation required for the <br />Project, as those terms are defined in Exhibit C to the Agreement) <br />Title <br />Other identifying information: <br />Date Pages <br />§ A.3.1.5 Allowances, if any, included in the Guaranteed Maximum Price: <br />(Identijy each allowance) <br />Item <br />Price <br />§ A.3.1.6 Assumptions and clarifications, if any, upon which the Guaranteed Maximum Price is based: <br />(Identijy each assumption and clarification) <br />§ A.3.1.7 The Guaranteed Maximum Price is based upon the following other documents and information: <br />(List any other documents or information here, or refer to an exhibit attached to this Amendment.) <br />ARTICLE A.4 CONSTRUCTION MANAGER'S CONSULTANTS, CONTRACTORS, DESIGN PROFESSIONALS, AND <br />SUPPLIERS <br />§ A.4.1 The Construction Manager shall retain the consultants, contractors, design professionals, and suppliers, identified <br />below: <br />(List name, discipline, address, and other information) <br />This Amendment to the Agreement entered into as of the day and year first written above. <br />OWNER (Signature) <br />(Printed name and title) <br />CONSTRUCTION MANAGER (Signature) <br />Tom H. Brown, President <br />(Printed name and title) <br />Init. AIA Document A133- — 2019 Exhibit A. Copyright @ 1991, 2003, 2009, and 2019 by The American Institute of Architects. All rights reserved. The "American <br />Institute of Architects," "AIA," the AIA Logo, and "AIA Contract Documents' are registered trademarks and may not be used without permission. This document was 4 <br />produced by AIA software at 15:01:37 CT on 01/27/2021 under Order No.6421824392 which expires on 04/24/2021, is not for resale, is licensed for one-time use <br />t only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org. <br />User Notes: (1312189750) <br />