§ A.2.2 Unless otherwise provided, the Contract Time is the period of time, including authorized adjustments, allotted in <br />the Contract Documents for Substantial Completion of the Work. The Contract Time shall be measured from the date of <br />commencement of the Work. <br />§ A.2.3 Substantial Completion <br />§ A.2.3.1 Subject to adjustments of the Contract Time as provided in the Contract Documents, the Construction Manager <br />shall achieve Substantial Completion of the entire Work: <br />(Check one of the following boxes and complete the necessary information) <br />[ ] Not later than ( ) calendar days from the date of commencement of the Work. <br />[ X ] By the following date: Fire Station #3: April 30, 2022. <br />§ A.2.3.2 Subject to adjustments of the Contract Time as provided in the Contract Documents, if portions of the Work are <br />to be completed prior to Substantial Completion of the entire Work, the Construction Manager shall achieve Substantial <br />Completion of such portions by the following dates: <br />Portion of Work Substantial Completion Date <br />§ A.2.3.3 If the Construction Manager fails to achieve Substantial Completion as provided in this Section A.2.3, liquidated <br />damages, if any, shall be assessed as set forth in Section 6.1.6 of the Agreement. <br />ARTICLE A.3 INFORMATION UPON WHICH AMENDMENT IS BASED <br />§ A.3.1 The Guaranteed Maximum Price and Contract Time set forth in this Amendment are based on the Contract <br />Documents and the following: <br />§ A.3.1.1 The following Supplementary and other Conditions of the Contract: <br />Document Title Date Pages <br />§ A.3.1.2 The following Specifications: <br />(Either list the Specifications here, or refer to an exhibit attached to this Amendment) <br />Fire Station #3: <br />Specifications Dated December 16, 2020 prepared by BKV Group <br />Addendum #1 Dated December 29, 2020 prepared by BKV Group <br />Addendum #2 Dated January 7, 2021 prepared by BKV Group <br />Addendum #3 Dated January 14, 2021 prepared by BKV Group <br />Addendum #4 Dated January 18, 2021 prepared by BKV Group <br />Section Title Date Pages <br />§ A.3.1.3 The following Drawings: <br />(Either list the Drawings here, or refer to an exhibit attached to this Amendment.) <br />Fire Station #3: <br />Drawings Dated December 16, 2020 prepared by BKV Group <br />Addendum #1 Dated December 29, 2020 prepared by BKV Group <br />Addendum #2 Dated January 7, 2021 prepared by BKV Group <br />Addendum #3 Dated January 14, 2021 prepared by BKV Group <br />Addendum #4 Dated January 18, 2021 prepared by BKV Group <br />Init. AIA Document A133- — 2019 Exhibit A. Copyright @ 1991, 2003, 2009, and 2019 by The American Institute of Architects. All rights reserved. The "American <br />Institute of Architects," "AIA," the AIA Logo, and "AIA Contract Documents' are registered trademarks and may not be used without permission. This document was 3 <br />produced by AIA software at 15:01:37 CT on 01/27/2021 under Order No.6421824392 which expires on 04/24/2021, is not for resale, is licensed for one-time use <br />t only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail copyright@aia.org. <br />User Notes: (1312189750) <br />