My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.2. SR 02-01-2021
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2021
>
02-01-2021
>
8.2. SR 02-01-2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2021 11:05:08 AM
Creation date
1/29/2021 10:18:08 AM
Metadata
Fields
Template:
City Government
type
SR
date
2/1/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Additions and Deletions Report for <br />AIA® Document A 133" — 2019 Exhibit A <br />This Additions and Deletions Report, as defined on page 1 of the associated document, reproduces below all text the author has added <br />to the standard form AIA document in order to complete it, as well as any text the author may have added to or deleted from the original <br />AIA text. Added text is shown underlined. Deleted text is indicated with a horizontal line through the original AIA text. <br />Note: This Additions and Deletions Report is provided for information purposes only and is not incorporated into or constitute any part <br />of the associated AIA document. This Additions and Deletions Report and its associated document were generated simultaneously by <br />AIA software at 15:01:37 CT on 01/27/2021. <br />PAGE 1 <br />This Amendment A-1 dated the 27th day of January in the year-2021, is incorporated into the accompanying AIA <br />Document A133TM-2019, Standard Form of Agreement Between Owner and Construction Manager as Constructor <br />where the basis of payment is the Cost of the Work Plus a Fee with a Guaranteed Maximum Price dated the day of in <br />the year---27th day of January in the Year 2021 for Fire Station #3. (the "Agreement") <br />Elk River Public Safety Building Expansion and Fire Station No. 3 <br />City of Elk River <br />13065 Orono Parkway NW <br />Elk River, MN 55330 <br />(Name, legal status, and address) <br />Terra General Contractors, Limited Liabilitompany <br />dba Terra Construction <br />21025 Commerce Blvd., Ste 1000 <br />Rogers MN 55374 <br />§ A.1.1.1 The Contract Sum is guaranteed by the Construction Manager not to exceed ($ Six Million Eight <br />Hundred Ninety -Eight Thousand Two Hundred Forty -Six and 00/100 ($6,898,246.00) for the Fire Station #3, subject <br />to additions and deductions by Change Order as provided in the Contract Documents. <br />PAGE 2 <br />See Attached Low Bid Summary - Exhibit 2 for the Fire Station #3 <br />Fire Station #3 Alternates: <br />Alternate #1 — Water Main for Future Wellhouse $60,130 <br />Alternate #2 — High Speed Doors $80,583 <br />Fire Station #3 Unit Prices: <br />Additions and Deletions Report for AIA Document A133- — 2019 Exhibit A. Copyright @ 1991, 2003, 2009, and 2019 by The American Institute of Architects. All <br />rights reserved. The "American Institute of Architects," "AIA," the AIA Logo, and "AIA Contract Documents' are registered trademarks and may not be used without <br />permission. This document was produced by AIA software at 15:01:37 CT on 01/27/2021 under Order No.6421824392 which expires on 04/24/2021, is not for <br />resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, <br />e-mail copyright@aia.org. <br />User Notes: (1312189750) <br />
The URL can be used to link to this page
Your browser does not support the video tag.