My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.3 ERMUSR 12-08-2020
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2020
>
12-08-2020
>
5.3 ERMUSR 12-08-2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2020 3:20:56 PM
Creation date
12/4/2020 3:20:56 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
12/8/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />(Paragraph deleted) <br />§ 1.1.4 The Owner’s anticipated design and construction milestone dates: <br />A Project Schedule will be developed and reviewed with the Owner as part of Programming and Space Planning. <br />.1 Design phase milestone dates, if any: <br />T.B.D <br />.2 Construction commencement date: <br />T.B.D <br /> <br />.3 Substantial Completion date or dates: <br />T.B.D <br /> <br />.4 Other milestone dates: <br />T.B.D <br />§ 1.1.5 The Owner intends the following procurement and delivery method for the Project: <br />(Identify method such as competitive bid or negotiated contract, as well as any requirements for accelerated or <br />fast-track design and construction, multiple bid packages, or phased construction.) <br /> CM@R with a GMP for Construction Project or Competitive Bid Project. <br />(Paragraphs deleted) <br />§ 1.1.6 The Owner’s anticipated Sustainable Objective for the Project: <br /> (Identify and describe the Owner’s Sustainable Objective for the Project, if any.) <br /> ERMU will work with the City of Elk River’s Sustainable Goals and Guidelines for Construction. <br />(Paragraphs deleted) <br />§ 1.1.7 The Owner identifies the following representative in accordance with Section 5.3: <br />(List name, address, and other contact information.) <br /> Chris Kerzman, P.E. <br /> Engineering Manager <br /> Elk River Municipal Utilities <br /> 1705 Main Street <br /> Elk River, MN 55330-0430 <br /> Telephone Number: 763-441-2020 <br />§ 1.1.8 The persons or entities, in addition to the Owner’s representative, who are required to review the Architect’s <br />submittals to the Owner are as follows: <br />(List name, address, and other contact information.) <br />The Utilities Commission, General Manager Theresa Slominski, and their designees shall review the Architect’s <br />submittals to the Owner. <br />(Paragraphs deleted) <br />§ 1.1.9 The Owner shall retain the following consultants and contractors: <br />(List name, legal status, address, and other contact information.) <br />.1 Geotechnical Engineer: T.B.D <br /> <br /> <br /> <br /> ™ <br />AIA Document B101 Copyright © 1974, 1978, 1987, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. The “American <br /> – 2017. <br />Init. <br /> Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are registered trademarks and may not be used without permission. This document was <br />3 <br />produced by AIA software at 10:15:59 ET on 11/23/2020 under Order No.9712742774 which expires on 08/13/2021, is not for resale, is licensed for one-time use <br />® <br />/ <br />only, and may only be used in accordance with the AIA Contract Documents Terms of Service. To report copyright violations, e-mail copyright@aia.org. <br />User Notes: (1800630329) <br />127 <br />
The URL can be used to link to this page
Your browser does not support the video tag.