Laserfiche WebLink
<br />TABLE OF ARTICLES <br />1 INITIAL INFORMATION <br /> 2 ARCHITECT’S RESPONSIBILITIES <br /> 3 SCOPE OF ARCHITECT’S BASIC SERVICES <br />4 SUPPLEMENTAL AND ADDITIONAL SERVICES <br /> 5 OWNER’S RESPONSIBILITIES <br />6 COST OF THE WORK <br />7 COPYRIGHTS AND LICENSES <br />8 CLAIMS AND DISPUTES <br />9 TERMINATION OR SUSPENSION <br />10 MISCELLANEOUS PROVISIONS <br />11 COMPENSATION <br />12 SPECIAL TERMS AND CONDITIONS <br />13 SCOPE OF THE AGREEMENT <br />ARTICLE 1 INITIAL INFORMATION <br />(Paragraphs deleted) <br />§ 1.1 This Agreement is based on the Initial Information set forth in this Section 1.1. <br />(For each item in this section, insert the information or a statement such as "not applicable" or "unknown at time of <br />execution.") <br />§ 1.1.1 The Owner’s program for the Project: <br /> (Insert the Owner’s program, identify documentation that establishes the Owner’s program, or state the manner in <br />which the program will be developed.) <br />th <br />A complete space program has been developed for This project Dated April 29, 2020 and is referenced as part of this <br />document. The total size of the building is expected to be 64,500 sq. ft. in total area. <br />(Paragraphs deleted) <br />§ 1.1.2 The Project’s physical characteristics: <br /> (Identify or describe pertinent information about the Project’s physical characteristics, such as size; location; <br />dimensions; geotechnical reports; site boundaries; topographic surveys; traffic and utility studies; availability of <br />public and private utilities and services; legal description of the site, etc.) <br />The building is planned to be constructed out of precast panels for the vehicle storage addition with a combination of <br />steel studs and structural steel framing for the office addition and remodeled areas.. Final materials and construction <br />techniques will be developed with the program and cost estimates. <br />§ 1.1.3 The Owner’s budget for the Cost of the Work, as defined in Section 6.1: <br />(Provide total and, if known, a line item breakdown.) <br /> Construction budget is based on $10,000,000.00 <br /> ™ <br />AIA Document B101 Copyright © 1974, 1978, 1987, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. The “American <br /> – 2017. <br />Init. <br /> Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are registered trademarks and may not be used without permission. This document was <br />2 <br />produced by AIA software at 10:15:59 ET on 11/23/2020 under Order No.9712742774 which expires on 08/13/2021, is not for resale, is licensed for one-time use <br />® <br />/ <br />only, and may only be used in accordance with the AIA Contract Documents Terms of Service. To report copyright violations, e-mail copyright@aia.org. <br />User Notes: (1800630329) <br />126 <br />