Laserfiche WebLink
<br /> <br />.2 Civil Engineer: Civil Engineering and Survey <br /> Landform <br /> 105 South Fifth Avenue Suite 513 <br /> Minneapolis, MN 55401 <br /> Telephone Number: 612-252-9070 <br /> <br />(Paragraphs deleted) <br />§ 1.1.10 The Architect identifies the following representative in accordance with Section 2.3: <br />(List name, address, and other contact information.) <br /> Michael Schellin <br /> 15 Groveland Terrace <br /> Minneapolis, MN 55403 <br /> Telephone Number: 613-377-2737 <br /> Email Address: mschellin@kodet.com <br />(Paragraphs deleted) <br />§ 1.1.11 The Architect shall retain the consultants identified in Sections 1.1.11.1 and 1.1.11.2: <br />(List name, legal status, address, and other contact information.) <br />(Paragraphs deleted) <br />§ 1.1.11.1 Consultants retained under Basic Services: <br />.1 Structural Engineer: <br /> Sandman Structural Engineers <br /> 10900 Noble Avenue North <br /> Champlin, MN 55316 <br /> Telephone Number: 763-560-5300 <br /> Project Representative: Greg Duerr, P.E. <br />.2 Mechanical/Electrical Engineer: <br /> Emanuelson-Podas, Inc. <br /> 87705 Bush Lake Road <br /> Edina, MN 55439 <br /> Telephone Number: (952) 930-0050 <br /> Project Representative: Scott Vander Heiden, P.E. <br />(Paragraph deleted) <br />§ 1.1.11.2 Consultants retained under Supplemental Services: <br /> Hazardous Materials and Environmental Testing Services to be added, if required, as additional service. <br />§ 1.1.12 Other Initial Information on which the Agreement is based: <br /> None <br />§ 1.2 The Owner and Architect may rely on the Initial Information. Both parties, however, recognize that the Initial <br />Information may materially change. If the Architect identifies a material change such that Architect’s services, <br />schedule for Architect’s services, and the Architect’s compensation may be affected, then the Architect shall submit <br />information regarding that purported material change and any information substantiating the material change to the <br />Owner within thirty (30) days of the event giving rise to the material change for review. The Owner’s budget for Cost <br />of Work, the Owner’s anticipated design, and construction milestones shall not change without written approval from <br />the Owner. If the Architect fails to submit the material change to the District within thirty (30) days of the event giving <br /> ™ <br />AIA Document B101 Copyright © 1974, 1978, 1987, 1997, 2007 and 2017 by The American Institute of Architects. All rights reserved. The “American <br /> – 2017. <br />Init. <br /> Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are registered trademarks and may not be used without permission. This document was <br />4 <br />produced by AIA software at 10:15:59 ET on 11/23/2020 under Order No.9712742774 which expires on 08/13/2021, is not for resale, is licensed for one-time use <br />® <br />/ <br />only, and may only be used in accordance with the AIA Contract Documents Terms of Service. To report copyright violations, e-mail copyright@aia.org. <br />User Notes: (1800630329) <br />128 <br />