Laserfiche WebLink
PROJECT APPROACH <br />BKV <br />G R O U P <br />DESIGN DEVELOPMENT PHASE <br />Throughout the DID phase, BKV Group will conduct a series of workshops guiding <br />the owner through the process of selecting mechanical systems, selecting <br />finishes and equipment, planning all of the casework, picking plumbing and <br />lighting fixtures, etc. At each workshop and for each topic we will discuss how <br />the proposed options will impact police operations or fire operations and what <br />specific workflows are supported. <br />We will finish the building energy model and begin to output information about <br />optimal insulation thicknesses, lifecycle savings from daylighting, anticipated <br />energy costs, etc. Other sustainable approaches will be discussed and confirmed. <br />We will finalize all of the engineering designs, including the integration of altering/ <br />dispatching equipment, to conform with city standards and the latest code <br />requirements. We will assemble product cut sheets of each proposed material <br />and equipment to be clear about the design intent, and we will assemble a <br />specification document for your review. Spaces with an elevated interior design, <br />like a training room, or complicated integration of many building systems, like <br />an apparatus bay, can be modeled in great detail and exported into a 3D spin <br />around that the city can use to understand the fine-grained details proposed for <br />the space. <br />These code assessments will be reviewed in detail with the appropriate regulatory <br />agents to ensure mutual interpretation. We will meet with Xcel Energy to help <br />the city through the design assist process to make sure that the project can take <br />full advantage of the rebates offered. We will update the city council and the <br />residents about project progress. <br />At the end of the phase, BKV Group's in-house quality assurance (QA) team will <br />review the design development deliverables just prior to the end of the phase to <br />catch any discrepancies and ensure a well -coordinated set. We will meet with <br />the owner's project team to discuss any final comments before getting notice to <br />proceed into construction documents. <br />Our design development deliverable will include grading and utility plans, <br />stormwater plans, landscape plans, irrigation plans, architectural site plans, <br />floor plans, fixtures, furnishings and equipment (FF&E) plans, reflected ceiling <br />plans, elevations, wall sections, interior elevations, door/window schedules, <br />interior finish plans, foundation plans, roof framing plans, mechanical plans and <br />schedules, plumbing plans and schedules, electrical plans and schedules, and <br />communications plans and schedules. In addition, we will include a code review, <br />up-to-date renderings, a detailed cost estimate, a description of potential cost - <br />control alternates, cut sheets for all the equipment, materials, and products <br />planned for the station, and a draft specification. <br />Finally, BKV Group has a tremendous value-added feature to ensure that the <br />design will serve the needs of police and firefighters. We utilize virtual reality <br />software that allows a police officer of firefighter to "walk" through the designed <br />facility to ensure that the design reflects the desires and needs of public safety <br />personnel. <br />1*01,1 I:Z1l4t1101►11, 014RLZA1429142:ITd4 <br />During this phase, we thoroughly develop the final drawings and specifications <br />to illustrate in detail the requirements for construction. We will resolve the last <br />few outstanding questions in workshops with the owner, but much of the time is <br />ENRICHING LIVES AND STRENGTHENING COMMUNITIES 1 52 <br />