Laserfiche WebLink
<br />EXHIBIT H <br />GENERAL & SITE-SPECIFIC REQUIREMENTS <br /> <br />3.0 PROGRESS MEETINGS <br />The CONTRACTOR will hold joint progress meetings with the CLIENT as mutually agreed. A representative from <br />each sub-CONTRACTOR must be present to report on each of the following items: (Note: a written report must <br />be available to the CLIENT before the meeting). The CONTRACTOR must forward a copy of the report to the <br />Authorized Agent by e-mail. <br /> <br />4.0 DISPOSAL <br />The CONTRACTOR shall be responsible for disposal or storage of all construction waste, trash and removed <br />equipment. <br /> <br />A. Disposal Facilities: The CONTRACTOR must furnish all disposal facilities. Disposal in CLIENT disposal <br />canisters will not be permitted. <br /> <br />B. Existing Equipment: Existing equipment removed during the retrofit must be stored in a trailer provided <br />by CONTRACTOR. The CLIENT will establish which equipment will be placed in storage. CLIENT also <br />reserves all salvage rights of any equipment being removed. <br /> <br />C. Lamp Disposal: The CONTRACTOR shall dispose of all removed lamps in accordance with all <br />environmental requirements and section 4.08 of the Agreement. The CONTRACTOR may furnish a <br />storage trailer on CLIENT property <br /> <br />D. Ballast Disposal: The CONTRACTOR shall dispose of all removed ballasts in accordance with all <br />environmental requirements and section 4.08 of the Agreement. The CONTRACTOR shall furnish <br />storage and containers for ballasts. <br /> <br />E. Hazardous Materials: With the exception of lamps and ballasts removed as part of this project, handling <br />or abatement of any hazardous materials, including asbestos containing material, is excluded from the <br />Scope of Services. <br /> <br />5.0 OFFICE AND STORAGE FACILITIES <br />The CONTRACTOR shall furnish office and storage trailers in accordance with their need and the following <br />conditions: <br /> <br />A. Office and storage trailers will be located in the designated area. <br />B. All trailers shall be provided with pads and blocking to prevent damage to blacktop or grass. <br />C. The CONTRACTOR’s equipment, materials and waste must be enclosed and secured. Piles of material <br />around trailers will not be permitted. <br />D. The CONTRACTOR must receive all materials and equipment. Materials cannot be stored or staged at <br />the loading dock. Parking will not be allowed at the loading dock <br /> <br />6.0 TELEPHONE SERVICE <br />The CONTRACTORs must provide for their own telephone service as required. <br /> <br />7.0 ELECTRIC SERVICE <br />The CONTRACTOR must furnish and install the electric service for the trailers as required. <br />EXHIBIT H Page 3 of 6 <br /> <br />