Laserfiche WebLink
<br />EXHIBIT F <br />CONTRACTOR’S M&V RESPONSIBILITIES <br /> <br />Air Handler Replacement (City Hall and Ice Arena) <br />1. Measurement and Verification Method: The method for verification of savings associated with this FIM <br />is based on Option E. <br />2. The pre-retrofit hours and efficiency will be stipulated as in Exhibit D <br />3. Post-retrofit, the verification will include review of installed equipment to ensure they will meet and <br />exceed the calculation shown in Exhibit D. <br />4. All other parameters are stipulated, and savings are calculated as summarized in Exhibit D. <br />5. No Post installation measurement will be performed, and the stipulated value will be used for all <br />calculations throughout the Guarantee Period <br /> <br /> <br /> <br />Operational Savings <br />1. Measurement and Verification Method: The method for verification of savings associated with this FIM <br />is based on Option E. <br />2. The pre-retrofit spending will be stipulated as in Exhibit D <br />3. Post-retrofit, the verification will include review of installed materials and locations to ensure they will <br />meet and exceed the calculation shown in Exhibit D. <br />4. All other parameters are stipulated, and savings are calculated as summarized in Exhibit D. <br />5. No Post installation measurement will be performed, and the stipulated value will be used for all <br />calculations throughout the Guarantee Period <br />EXHIBIT F Page 4 of 4 <br /> <br />