My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.2 SR 10-19-2020
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2020
>
10-19-2020
>
8.2 SR 10-19-2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2020 4:07:47 PM
Creation date
10/16/2020 9:22:09 AM
Metadata
Fields
Template:
City Government
type
SR
date
10/19/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />EXHIBIT F <br />CONTRACTOR’S M&V RESPONSIBILITIES <br /> <br />c. Upon verification that the measured values are consistent with the expected operating <br />parameters required for the savings calculations, the savings will be deemed achieved as <br />calculated in Exhibit D. The Client is required to maintain the schedules and set points according <br />to the Standards of Service and Comfort documented in Exhibit D. <br />4. All other parameters are stipulated, and savings are calculated as summarized in Exhibit D. <br />5. Post installation measurement will be performed one-time after the installation has been completed <br />and the measured value will be used for all calculations throughout the Guarantee Period <br /> <br />Summary: The savings will be measured by comparing the baseline parameters to the post-project <br />operation and performance data, which may include post-project inspections, to ensure the equipment <br />is operating as intended. All other parameters are stipulated, and savings are calculated as summarized <br />in Exhibit D. It is agreed that upon verification, as set forth above, of the savings in the first Guarantee <br />Year, the savings shall be deemed achieved for the duration of the Guarantee Period. <br /> <br />Boiler Plant Improvements: <br /> <br />1. Measurement and Verification Method: The method for verification of savings associated with this FIM <br />is based on Option E. <br />2. The pre-retrofit hours and efficiency will be stipulated as in Exhibit D <br />3. Post-retrofit, the verification will include review of installed equipment to ensure they will meet and <br />exceed the calculation shown in Exhibit D. <br />4. All other parameters are stipulated, and savings are calculated as summarized in Exhibit D. <br />5. No Post installation measurement will be performed, and the stipulated value will be used for all <br />calculations throughout the Guarantee Period <br /> <br />Building Envelope <br /> <br />1. Measurement and Verification Method: The method for verification of savings associated with this FIM <br />is based on Option E. <br />2. The pre-retrofit hours and gaps will be stipulated as in Exhibit D <br />3. Post-retrofit, the verification will include review of installed materials and locations to ensure they will <br />meet and exceed the calculation shown in Exhibit D. <br />4. All other parameters are stipulated, and savings are calculated as summarized in Exhibit D. <br />5. No Post installation measurement will be performed, and the stipulated value will be used for all <br />calculations throughout the Guarantee Period <br /> <br />Duct Sealant <br />1. Measurement and Verification Method: The method for verification of savings associated with this FIM <br />is based on Option E. <br />2. The pre-retrofit leakage and post leakage with associated VFD speed will be stipulated as in Exhibit D <br />3. Post-retrofit, the verification will include review of installed materials and locations to ensure they will <br />meet and exceed the calculation shown in Exhibit D. <br />4. All other parameters are stipulated, and savings are calculated as summarized in Exhibit D. <br />5. No Post installation measurement will be performed, and the stipulated value will be used for all <br />calculations throughout the Guarantee Period <br />EXHIBIT F Page 3 of 4 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.