<br />EXHIBIT F <br />CONTRACTOR’S M&V RESPONSIBILITIES <br /> <br />Measurement and Verification Plan <br />Measurement and Verification Options for each FIM <br /> <br />Building Lighting Improvements: <br />1. Measurement and Verification Method: The method for verification of savings associated with this FIM <br />is based on Option A. <br />2. What will be measured: Fixture wattages, on a sample of fixtures consisting of either single fixtures or a <br />circuit of fixtures, shall be measured on fixtures with a population of 50 or more. <br />3. Sample size to be measured: Measurements shall be taken of a representative sample, the size of which <br />shall not exceed 5% of the population, for unique retrofit types which have a total population of 50 or <br />more. For retrofits with less than this population the manufacturer’s published wattages for each <br />fixture type as referenced in the energy calculation section of the contract shall be used. <br />4. How will measurements be made: Power (watt) measurements will be performed with a handheld true- <br />RMS meter. Where applicable, the measurements will be performed at a wall switch. If it is not possible <br />to isolate the fixtures on one switch, then measurements will be performed at the individual fixture. <br />5. How will the measurements be used to determine actual savings: The pre-and post-field measurements <br />(watts) will be inserted in the original calculation spreadsheet to determine the actual savings. <br />6. How often will measurements be performed: Pre-retrofit power measurements will be taken once <br />immediately before work begins. After installation, the post-retrofit power measurements will be taken <br />once to determine actual savings for the first year. <br />7. Stipulated values used: Burn hours of the fixtures are stipulated as presented in the lighting calculation <br />spreadsheets included in the savings calculation section of the contract. These values were determined <br />through discussions with the Client and are agreed to by all parties. <br /> <br />Summary: Wattages, determined as previously described, operating hours, as set forth in in the energy <br />calculation section and the savings calculations, as set forth in the energy calculation section, shall be <br />used to determine savings for the entire guarantee period <br /> <br />Building Controls Modification <br />1. Measurement and Verification Method: The method for verification of savings associated with this FIM <br />is based on Option A. <br />2. Prior to project acceptance by the Client, CONTRACTOR will ensure that all operation schedules, set <br />points, and other relevant parameters are properly configured to achieve the savings set forth in Exhibit <br />D. The baseline initial operating parameters were determined through field observations, interviews, <br />existing trend data, and measurements. All other parameters are stipulated, and savings are calculated <br />as summarized in Exhibit D. <br />3. Post-retrofit: <br />a. The building automation system shall provide actual trend data that may include: <br />i. Optimized Start Stop Schedule: run time and schedules, discharge air temperature <br />ii. Existing VFD: average VFD speeds, outdoor air damper positions <br />iii. Pressure Control: average VFD speeds, space pressure set point <br />iv. Demand Control Ventilation: outdoor air damper positions, outdoor air temperature, <br />discharge air temperature, CO2 readings <br />v. And other equipment operation parameters as needed <br />b. These data will be collected during a representative period in the first Guarantee Year and <br />compared to projected values established as documented in Exhibit D. <br />EXHIBIT F Page 2 of 4 <br /> <br />