My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.2 SR 10-19-2020
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2020
>
10-19-2020
>
8.2 SR 10-19-2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2020 4:07:47 PM
Creation date
10/16/2020 9:22:09 AM
Metadata
Fields
Template:
City Government
type
SR
date
10/19/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />EXHIBIT F <br />CONTRACTOR’S M&V RESPONSIBILITIES <br /> <br />CONTRACTOR’S MEASUREMENT & VERIFICATION RESPONSIBILITIES <br />Scope of Services: The CONTRACTOR shall provide the services identified in the summary table included in this <br />section: <br /> All pre-and post-retrofit measurements as needed to verify each Facility Improvement Measure (FIM) as <br />noted in the table. <br /> First Year Annual Report to the CLIENT to verify that guaranteed savings have been met or determine if <br />guaranteed savings have not been met and to establish ongoing units of energy saved for future annual <br />reports. <br /> Additional Annual Reports to update the Annual Savings with updated utility rates based on the average <br />cost of utilities of the previous 12 months. <br /> <br />This Exhibit details the individual responsibilities of the CONTRACTOR, not otherwise set forth in this Guaranteed <br />Energy Savings Agreement, in connection with the management and administration of the Savings Guarantee. <br /> <br />CONTRACTOR’s Equipment: The CONTRACTOR may provide tools, documentation, panels, or other equipment <br />in the facility for the CONTRACTOR’s convenience in performing the CONTRACTOR’s Measurement and <br />Verification Responsibilities. That equipment shall remain the CONTRACTOR’s property. The CONTRACTOR <br />retains the right to remove such items at any time during the term, or upon the termination of CONTRACTOR’s <br />Measurement and Verification Responsibilities. <br /> <br />Measurements and Verification Methods: The CONTRACTOR shall use the following methods as outlined <br />in the table, to measure and verify utility savings throughout the term of this Agreement. <br /> <br />The approach to M&V is based on the International Performance Measurement and Verification Protocol <br />(IPMVP) Volume 1 2012 (January 2012). IPMVP Volume 1 is a guidance document describing common practice <br />in measuring, computing, and reporting savings achieved by energy or water efficiency projects at end user <br />facilities. The IPMVP presents a framework and the four M&V options. For purposes of this Agreement, the <br />Parties have also included an additional M&V Option – “Stipulated” savings. “Stipulated” savings are not subject <br />to measurement or verification and do not include M&V activities and is utilized on FIMs where the costs to <br />accurately calculate, measure, or monitor the projected savings would be greater than the anticipated savings <br />value. <br /> <br />Option Description Typical Applications <br /> <br />Savings are determined by partial field measurements of key <br /> <br />IPMVP Type A: Partially Measured energy uses which is applied to the FIM. Estimates of the non- <br />A Retrofit Isolation with Stipulated Values key parameters are used for the savings calculations. <br /> <br />Savings are determined by field measurement of the energy use <br />B IPMVP Type B: Retrofit Isolation of the system which the FIM was applied. <br />Savings are determined by measuring energy use at the utility <br /> <br />meter. Corrections are made for weather and other factors <br />C IPMVP Type C: Whole Facility impacting savings. <br /> <br />Savings are determined by building simulation (building <br />D IPMVP Type D: Calibrated Simulation modeling). <br /> <br /> <br /> Used where cost to accurately calculate and/or measure <br />E Stipulated Savings savings would exceed anticipated savings. <br />EXHIBIT F Page 1 of 4 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.