My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.4 SR 10-19-2020
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2020
>
10-19-2020
>
7.4 SR 10-19-2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2021 9:45:43 AM
Creation date
10/16/2020 8:53:28 AM
Metadata
Fields
Template:
City Government
type
SR
date
10/19/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The plat also includes ROW dedication for Orono Parkway, a smaller parcel size for the parcel including City <br />Hall and the Public Safety Facility and combines multiple lots and ROW to create a larger Orono Park parcel. <br />This request only includes the preliminary plat as the ownership between the EDA and City of Elk River will <br />need to be resolved prior to approving and recording the final plat. Once the conditions of the preliminary plat <br />are satisfied and the included parcels are under the correct ownership, staff will bring the final plat forward for <br />consideration on a future consent agenda. <br />Easement Vacation <br />The Orono Park Addition plat will clean up remnant ROW and drainage and utility easements existing since <br />the street through the park was removed and Gary Street was improved. New easements preserving access and <br />maintenance rights for all existing utilities and streets will be dedicated with the plat of Orono Park Addition. <br />Easement Vacations may only be approved if they are in the public benefit. Staffs analysis shows the former <br />road and utility locations no longer require easements and all existing infrastructure will continue to be <br />protected with new or existing easements. The proposed vacation is in the public's benefit. <br />Conditional Use Permit <br />The Public Safety Facility, was constructed in the early 2000s and while additional capacity was included at the <br />time of construction, changing standards and increased staffing demands now require an addition to both the <br />police and fire sides of the building. <br />The Fire Department seeks to add two apparatus bays to the south end of the building and convert two of the <br />existing bays into critical support spaces for firefighters. The Police Department seeks to add a 28-stall garage <br />for their squad cars, build out second floor shell space into administrative offices and convert the existing <br />squad garage space to physical training space and storage. <br />Planning Commission <br />The Planning Commission held a public hearing for the Preliminary Plat of Orono Park Addition and the <br />expansion of the public safety building. No one spoke for or against the requests and the Commission <br />unanimously recommended approval of both applications. <br />The Planning Commission, acting as the Board of Adjustments, also unanimously approved the necessary <br />variances to support the expansion of the public safety building. <br />Financial Impact <br />None <br />Mission/Policy/Goal <br />The proposed plat supports the growth and development of the city's park system, consistent with the <br />Parks and Recreation Master Plan. <br />Attachments <br />■ The September 22, 2020, Planning Commission packet for the Preliminary Plat <br />■ The September 22, 2020, Planning Commission packet for the Conditional Use Permit <br />■ Easement Vacation Resolution <br />■ Easement Vacation Exhibits <br />
The URL can be used to link to this page
Your browser does not support the video tag.