My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.1. SR 08-17-2020
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2020
>
08-17-2020
>
8.1. SR 08-17-2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2020 10:00:26 AM
Creation date
8/14/2020 7:57:06 AM
Metadata
Fields
Template:
City Government
type
SR
date
8/17/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
communication which will help identify any work <br />that is in non-conformance or not acceptable. We <br />have found that the earlier a deficiency can be <br />identified, the easier it is to resolve and the less <br />impact it has on the construction cost or schedule. <br />SCHEDULING <br />Pre -Construction <br />Pre -construction services will include: <br />• Develop and update the design schedule <br />including specific milestones and bidding <br />dates <br />• Identify long lead items and determine the <br />need for early bid packages <br />• Constructability Reviews and Clash Detection <br />• Value Engineering <br />• Budget analysis and updates <br />• Life cycle cost analysis <br />• Develop Comprehensive Construction Cost <br />Estimates <br />• Develop and price a list of alternates <br />• Perform a series of Q/A Document Reviews <br />• Coordinate permit and plan reviews with the <br />City of Elk River <br />• Bid Package and Scope Development <br />• Develop the Critical Path Construction <br />Schedule <br />• Develop construction phasing and site <br />logistics plans <br />Terra <br />cityofN7Hope-GWHA—ice li.. <br />A. <br />ya Be ang., <br />ScHetloletor—o( 7rz 01e <br />Example 3-Week Look <br />Ahead Schedule <br />• Provide local contractor / supplier outreach <br />• Coordinate tax exempt purchasing agreements <br />• Solicit and receive bids, prepare a bid analyses <br />and make recommendations <br />During pre -construction, Terra will coordinate a <br />scheduling meeting with BKV to plan the design <br />milestones including the Design Development <br />(DD) completion, GMP establishment, Construction <br />Document (CD) duration and key CD milestones. This <br />schedule will outline various design and user group <br />meetings or "committee workshops' with specific <br />agenda items. <br />Our involvement throughout the design phase will <br />allow the entire team to collaborate on key design, <br />bidding and construction milestones to be included <br />and updated in the CPM Schedule. We will review <br />early bid packages and incorporate them into the <br />overall schedule. Terra utilizes Microsoft Project <br />scheduling software to create the master Critical <br />Path Method (CPM) project schedule and includes <br />this schedule with the bidding documents. <br />Terra utilizes various tools and opportunities in <br />the documentation of the scope of work and the <br />establishment of the GMP. Rather than relying on the <br />information in a set of drawings, we approach this <br />collaboratively and utilize the following strategies to <br />18 CITY OF ELK RIVER I Elk River Public Safety Building Expansion and Elk River Fire Station #3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.