My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-12-2020 ERMU MIN
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Minutes
>
2020-2029
>
2020
>
05-12-2020 ERMU MIN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2020 4:55:19 PM
Creation date
6/10/2020 2:14:49 PM
Metadata
Fields
Template:
City Government
type
ERMUMIN
date
5/12/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5.2 2020 First Quarter Delinquent Items <br />Ms. Karpinski presented the delinquent items for the first quarter, including a delinquent <br />amounts report totaling $2,707.86 for all services. She also presented the delinquent <br />items comparisons for 2017 — 2020. Ms. Karpinski noted that our percentage of <br />uncollectible accounts, at .029% per revenue dollar, is well below the national average <br />which is between .17% and .40%. <br />Chair Dietz asked if there was an increase in the number of customers delinquencies due <br />to COVID-19. Ms. Nelson responded that payment arrangement calls have decreased <br />significantly. She added that the Credit & Collections Specialist has stayed in contact with <br />customers to ensure they understand the changes to energy assistance guidelines. <br />Moved by Commissioner Nadeau and seconded by Commissioner Bell to approve the <br />2020 First Quarter Delinquent Items. Motion carried 5-0. <br />5.3 Electric and Water Cost of Service and Rate Design Study <br />ERMU staff has been working with Dave Berg Consulting, LLC on an electric and water cost <br />of service and rate design study. The work was done to evaluate possible changes to the <br />electric and water retail rates and applicable fees. Staff evaluated changes in operating <br />conditions, including but not limited to: monthly fixed costs, additional service fees, <br />bonding for the new field services building, and retail energy and water rates. <br />Mr. Berg was at the meeting to present the draft reports and answer any questions the <br />commission may have. Mr. Berg walked the commission through the high points of the <br />Water Cost of Service and Rate Design Study draft report which included: Projected <br />Operating Results with Existing Rates, Cost of Service, and Proposed Rates. <br />For the Projected Operating Results with Existing Rates Section in the water report Chair <br />Dietz asked why the study utilized flat operating revenue for the utilities from 2020 to <br />2024. Mr. Berg explained that by using flat water and electric sales for the study period it <br />helps creates a conservative baseline for staff to work with. <br />Commissioner Stewart inquired if the capital improvement data had been updated based <br />on any new information on the Highway 169 Redefine project. Mr. Adams responded that <br />ERMU has not received final plans for the project. Ms. Slominski added that these are the <br />best estimates based on the information available at this time. <br />For the Cost of Service Section in the water report Mr. Berg noted that when comparing <br />residential water customers to commercial/industrial water customers, the respective <br />costs of service closely matched the percentage of revenue. Based on the overall revenue <br />and cash reserve needs of the water department, and the results of the cost of service <br />analysis, Mr. Berg did not recommend a change in water rates, however he did <br />Elk River Municipal Utilities Commission Meeting Minutes <br />May 12, 2020 <br />Page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.