My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.2 SR 06-01-2020
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2020
>
06-01-2020
>
7.2 SR 06-01-2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2020 3:46:01 PM
Creation date
5/29/2020 9:20:50 AM
Metadata
Fields
Template:
City Government
type
SR
date
6/1/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PLANNING COMMISSION <br />April 28, 2020 <br />(John Jordan recused himself due to probable litigation between homeowners and builder. Zack muted <br />the audio and video.) <br />Zack: All right, so 6.1, it's a Tall Pines PUD Second Addition. It's located generally north of where the <br />first Tall Pines project was, just south of the light manufacturing facility. It's also located on Line <br />Avenue. We did look at this one about a year ago, it's now coming back. The applicant had <br />previously withdrawn their application due to — to wait for an understanding of where MNDOT <br />was going to provide access to 169 as far as interchanges and how that would affect some of our <br />local road networks. So they had withdrawn it and now they've resubmitted it. <br />The proposal is for 29 residential villas. It's on 40' lots, very similar to the Tall Pines @ Elk River <br />First Addition. It's the villa style detached townhomes which we've seen in a number of other <br />locations, including Cleaver Lake Fields and West Oaks. This is the same developer that <br />completed West Oaks as well as the Tall Pines First Addition. <br />This would be developed as a PUD or planned unit development and it does require a zone <br />change to PUD, a conditional use permit to establish that planned unit development, and then <br />also a preliminary plat. <br />The only street in the subdivision would be a private street and that would connect directly to <br />Line Avenue. There would be no particular access east onto Twin Lakes Road and there will be a <br />right-of-way dedication for a future cul-de-sac of Line Avenue which is part of the larger <br />transportation changes that are resulting from Highway 169 improvements. <br />This will all be served by city utilities. <br />So there are some concerns with some wetland buffer setback impacts. However, after working <br />with the environmental staff and the consultants for this applicant, we feel we've come to the <br />best solution for this particular case. There are alternatives, but that would include filling <br />wetlands which none of us want to do, so we're comfortable with our proposal with some <br />encroachment into that 45' setback; there are no encroachments into the 25' setback. <br />The comprehensive plan guides this area for mixed use which does support higher density <br />residential land uses, but it's currently zoned business park. <br />Here's the site plan as it is today. <br />Here's the cul-de-sac on Line Avenue so the connection north -south would be terminated and <br />that would be at a later date. Here's a better image showing that, so you can see Line Avenue, <br />and 51" Street would become a through road while this cul-de-sac would push all the traffic to <br />the south so it would eliminate that cut -through traffic on Line Avenue. It's part of the plan <br />improvements as a result of Highway 169. <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.