Laserfiche WebLink
MnDOT Contract No. 1028386 Work Order No. 1 <br />Exhibit B <br />Detailed Scope of Work and Deliverables <br /> <br />2 <br />The Local Government/Agency has this study scheduled to be completed by the end of 2021. The key study deliverables <br />from this effort are: <br />1. A well-coordinated project management and agency partnership. <br />2. An organized community engagement and stakeholder participation to reach consensus on an improvement plan for the <br />future of Trunk Highway 10 and the surrounding area. <br />3. Identification of proper scale and detail with respect to corridor right of way, public/private utilities, and environmental <br />site assessment. <br />4. An existing and future conditions evaluation – access, safety, corridor/ intersection operations, multimodal systems, and <br />land use. <br />5. 2045 traffic forecasts and short- and mid-term timeframes, as necessary. <br />6. A conceptual design alternatives for corridor improvements and intersection layouts, along with evaluation of these <br />concepts. This will include consideration of current topography, utilities, and right of way, plus identified environmental <br />constraints and resultant drainage needs. <br />7. A well-organized implementation plan with short-, mid-, and long-term improvements defined – including cost estimates <br />and potential funding options. <br /> <br /> <br />