My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9.3. SR 03-16-2020
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2020
>
03-16-2020
>
9.3. SR 03-16-2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2021 10:21:38 AM
Creation date
3/13/2020 9:53:09 AM
Metadata
Fields
Template:
City Government
type
SR
date
3/16/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Spack Solutions 5 of 6 Line Avenue Residential Development <br />Traffic Assessment <br />Figure 2 — New Site Trips — Future Line Avenue Layout <br />AM Peak Hour <br />/J O 2 a O 3 -20 4 CNN <br />PM Peak Hour <br />Daily <br />r <br />f <br />As seen in Figures 1 and 2, the highest peak hour volume increase for any movement at an <br />existing intersection due to the new site traffic is ten vehicles. That equates to an increase of <br />approximately one vehicle every six minutes for those movements. Based on these volumes, <br />none of the surrounding intersections are anticipated to be significantly impacted by site traffic. <br />Additionally, the Line Avenue/Main Street intersection was modeled as having Level of Service <br />B and C operations in the peak hours in the 2016 Traffic Impact Study. The amount of traffic <br />being added to that intersection from this development would not be expected to significantly <br />impact those operations under the existing or future roadway configurations. <br />
The URL can be used to link to this page
Your browser does not support the video tag.