My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9.3. SR 03-16-2020
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2020
>
03-16-2020
>
9.3. SR 03-16-2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2021 10:21:38 AM
Creation date
3/13/2020 9:53:09 AM
Metadata
Fields
Template:
City Government
type
SR
date
3/16/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Spack Solutions 6 of 6 Line Avenue Residential Development <br />Traffic Assessment <br />Site Review <br />There are currently no pedestrian or bicycle facilities on Line Avenue at the location of the site <br />access. The Elk River Comprehensive Plan indicates a trail facility is proposed on Line Avenue in <br />the future. When that facility is constructed, it is recommended that this development connect <br />to that facility with ADA compliant curb ramps, sidewalks, and potentially a pedestrian crossing <br />on Line Avenue, if needed. <br />Within the site, vehicles will be able to use the cul-de-sac as a turnaround point, and a <br />hammerhead turnaround is provided off of the private road to allow larger vehicles (delivery, <br />garbage collection, etc.) to be able to turn around within the site. <br />Attachments <br />• Site Plan <br />• 2020 Line Avenue Traffic Volumes <br />
The URL can be used to link to this page
Your browser does not support the video tag.