Laserfiche WebLink
Spock Solutions <br />4 of 6 Line Avenue Residential Development <br />Traffic Assessment <br />When Line Avenue is cut north of the site access, it is anticipated the distribution pattern would <br />be: <br />• 10% of the generated traffic to/from the west on 3rd Street <br />• 20% of the generated traffic to/from the east on 1815Y Avenue <br />• 20% of the generated traffic to/from the south on Zane Street <br />• 50% of the generated traffic to/from the west on Main Street <br />In this scenario 100% of the site traffic would go to/from the south at the site access. <br />The new site trips from the residential development are shown in Figure 1 for the existing Line <br />Avenue layout and Figure 2 for the proposed future Line Avenue Layout. <br />Figure 1— New Site Trips — Existing Line Avenue Layout <br />AM Peak Hour <br />qo \ l coo <br />r� °� rg <br />C N \ aho <br />PM Peak Hour <br />oj, <br />OOE � aao <br />Daily <br />0 JD <br />r- 82 it • <br />