My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.1. ERMUSR 12-17-2019
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2019
>
12-17-2019 SPECIAL
>
4.1. ERMUSR 12-17-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2019 3:57:01 PM
Creation date
12/19/2019 3:40:14 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
12/17/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
479
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE 2 - STANDARD CONTRACTS <br />Minnesota DER Technical Interconnection and Interoperability Requirements in E-999/CI-16- <br />521 (anticipated July 2019.) <br />Nameplate Rating - nominal voltage (V), current (A), maximum active power (kWac), apparent <br />power (kVA), and reactive power (kVar) at which a DER is capable of sustained operation. For a <br />Local EPS with multiple DER units, the aggregate nameplate rating is equal to the sum of all <br />DERs nameplate rating in the Local EPS. For purposes of the Attachment V in the <br />I <br />limited thought use of control systems, power relays or similar device settings or adjustments <br />as identified in IEEE 1547. The nameplate ratings referenced in the Interconnection Process are <br />alternating current nameplate DER ratings at the Point of DER Coupling. <br />Network Upgrades Additions, modifications, and upgrades to the Transmission System <br />required at or beyond the point at which the DER interconnects with the <br />Network Upgrades do not include Distribution Upgrades. <br />Operating Requirements Any operating and technical requirements that may be applicable <br />Requirements, including those set forth in the Interconnection Agreement. <br />Party or Parties The Area EPS Operator and the Interconnection Customer. <br />Point of Common Coupling (PCC) The point where the Interconnection Facilities connect with <br />as specified by the Area EPS Operator and described in the National Electrical Code and <br />the National Electrical Safety Code. <br />Municipal Minnesota Interconnection Agreement _ January 2019 28 <br /> <br />128 <br />
The URL can be used to link to this page
Your browser does not support the video tag.