My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.1. ERMUSR 12-17-2019
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2019
>
12-17-2019 SPECIAL
>
4.1. ERMUSR 12-17-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2019 3:57:01 PM
Creation date
12/19/2019 3:40:14 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
12/17/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
479
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE 2 - STANDARD CONTRACTS <br /> <br />Figure 1: Point of Common Coupling and Point of DER Connection <br />(Source: IEEE 1547) <br />Point of DER Connection (PoC) When identified as the Reference Point of Applicability, the <br />point where an individual DER is electrically connected in a Local EPS and meets the <br />requirements of this standard exclusive of any load present in the respective part of the Local <br />EPS (e.g. terminals of the inverter when no supplemental DER device is required.) For DER <br />unit(s) that are not self-sufficient to meet the requirements without a supplemental DER <br />device(s), the Point of DER Connection is the point where the requirements of this standard are <br />met by DER in conjunction with a supplemental DER device(s) exclusive of any load present in <br />the respective part of the Local EPS. <br />Queue Position The order of a valid Interconnection Application, relative to all other pending <br />valid Interconnection Applications, that is established based upon the date- and time- of receipt <br />of the complete Interconnection Application as described in Section 4.7 of the Overview <br />Process Error! Reference source not found.. <br />Reasonable Efforts With respect to an action required to be attempted or taken by a Party <br />under these procedures, efforts that are timely and consistent with Good Utility Practice and <br />are otherwise substantially equivalent to those a Party would use to protect its own interests. <br />Municipal Minnesota Interconnection Agreement _ January 2019 29 <br /> <br />129 <br />
The URL can be used to link to this page
Your browser does not support the video tag.