SCHEDULE 2 - STANDARD CONTRACTS <br /> <br />Figure 1: Point of Common Coupling and Point of DER Connection <br />(Source: IEEE 1547) <br />Point of DER Connection (PoC) When identified as the Reference Point of Applicability, the <br />point where an individual DER is electrically connected in a Local EPS and meets the <br />requirements of this standard exclusive of any load present in the respective part of the Local <br />EPS (e.g. terminals of the inverter when no supplemental DER device is required.) For DER <br />unit(s) that are not self-sufficient to meet the requirements without a supplemental DER <br />device(s), the Point of DER Connection is the point where the requirements of this standard are <br />met by DER in conjunction with a supplemental DER device(s) exclusive of any load present in <br />the respective part of the Local EPS. <br />Queue Position The order of a valid Interconnection Application, relative to all other pending <br />valid Interconnection Applications, that is established based upon the date- and time- of receipt <br />of the complete Interconnection Application as described in Section 4.7 of the Overview <br />Process Error! Reference source not found.. <br />Reasonable Efforts With respect to an action required to be attempted or taken by a Party <br />under these procedures, efforts that are timely and consistent with Good Utility Practice and <br />are otherwise substantially equivalent to those a Party would use to protect its own interests. <br />Municipal Minnesota Interconnection Agreement _ January 2019 29 <br /> <br />129 <br />