My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.1. ERMUSR 12-17-2019
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2019
>
12-17-2019 SPECIAL
>
4.1. ERMUSR 12-17-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2019 3:57:01 PM
Creation date
12/19/2019 3:40:14 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
12/17/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
479
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE 2 - STANDARD CONTRACTS <br />Interconnection Customer The person or entity, including the Area EPS Operator, whom will <br />Distribution System. The Interconnection Customer is responsible for ensuring the DER(s) is <br />designed, operated and maintained in compliance with the Minnesota Technical Requirements. <br />Interconnection Facilities <br />include all facilities and equipment between the DER and the Point of Common Coupling, <br />including any modification, additions or upgrades that are necessary to physically and <br />Customer Interconnection Facilities include: supplemental DER devices, inverters, and <br />associated wiring and cables up to the Point of DER Connection. Some examples of Area EPS <br />Operator Interconnection Facilities include sole use facilities; such as, line extensions, controls, <br />relays, switches, breakers, transformers and shall not include Distribution Upgrades or Network <br />Upgrades. <br />Interconnection Process <br />document. <br />Material Modification A modification to machine data, equipment configuration or to the <br />interconnection site of the DER at any time after receiving notification by the Area EPS <br />Operator of a complete Interconnection Application that has a material impact on the cost, <br />timing, or design of any Interconnection Facilities or Upgrades, or a material impact on the cost, <br />timing or design of any Interconnection Application with a later Queue Position or the safety or <br />1 <br />reliability of the Area EPS. <br />MN Technical Requirements The term including all of the DER technical interconnection <br />requirement documents for the state of Minnesota; including Attachment 2 Distributed <br />Order in E-999/CI-01-1023) until superseded and upon Commission approval of updated <br /> <br />1 <br /> A Material Modification shall include, but may not be limited to, a modification from the approved <br />Interconnection Application that: (1) changes the physical location of the point of common coupling; such that it is <br />likely to have an impact on technical review; (2) increases the nameplate rating or output characteristics of the <br />Distributed Energy Resource; (3) changes or replaces generating equipment, such as generator(s), inverter(s), <br />transformers, relaying, controls, etc., and substitutes equipment that is not like-kind substitution in certification, size, <br />ratings, impedances, efficiencies or capabilities of the equipment; (4) changes transformer connection(s) or <br />grounding; and/or (5) changes to a certified inverter with different specifications or different inverter control settings <br />or configuration. A Material Modification shall not include a modification from the approved Interconnection <br />Application that: (1) changes the ownership of a Distributed Energy Resource; (2) changes the address of the <br />Distributed Energy Resource, so long as the physical point of common coupling remains the same; (3) changes or <br />replaces generating equipment such as generator(s), inverter(s), solar panel(s), transformers, relaying, controls, etc. <br />and substitutes equipment that is a like-kind substitution in certification, size, ratings, impedances, efficiencies or <br />capabilities of the equipment; and/or (4) increases the DC/AC ratio but does not increase the maximum AC output <br />capability of the Distributed Energy Resource in a way that is likely to have an impact on technical review. <br />Municipal Minnesota Interconnection Agreement _ January 2019 27 <br /> <br />127 <br />
The URL can be used to link to this page
Your browser does not support the video tag.