SCHEDULE 2 - STANDARD CONTRACTS <br />Distribution Upgrades The additions, modifications, and upgrades to the Distribution System <br />at or beyond the Point of Common Coupling to facilitate interconnection of the DER and render <br />the distribution service necessary to affect <br />Distribution System. Distribution Upgrades do not include Interconnection Facilities. <br />Electric Power System (EPS) The facilities that deliver electric power to a load. <br />Fast Track Process The procedure as described in the Interconnection Process - Fast Track <br />Process for evaluating an Interconnection Application for a DER that meets the eligibility <br />requirements in the Overview Process Section 2.3. <br />Force Majeure Event An act of God, labor disturbance, act of the public enemy, war, <br />insurrection, riot, fire, storm or flood, explosion, breakage or accident to machinery or <br />equipment, an order, regulation or restriction imposed by governmental, military or lawfully <br />Event does not include an act of negligence or intentional wrongdoing. <br />Good Utility Practice Any of the practices, methods and acts engaged in or approved by a <br />significant portion of the electric industry during the relevant time period, or any of the <br />practices, methods and act which, in the exercise of reasonable judgment in light of the facts <br />known at the time the decision was made, could have been expected to accomplish the desired <br />result at a reasonable cost consistent with good business practices, reliability, safety and <br />expedition. Good Utility Practice is not intended to be limited to the optimum practice, method, <br />or act to the exclusion of all others, but rather to be acceptable practices, methods, or acts <br />generally accepted in the region. <br />Governmental Authority Any federal, state, local or other governmental regulatory or <br />administrative agency, court, commission, department, board, or other governmental <br />subdivision, legislature, rulemaking board, tribunal, or other governmental authority having <br />jurisdiction over the Parties, their respective facilities, or the respective services they provide, <br />and exercising or entitled to exercise any administrative, executive, police, or taxing authority <br />or power; provided, however, that such term does not include the Interconnection Customer, <br />the Area EPS Operator, or any Affiliate thereof. The local governing body is the <br />authority governing interconnection requirements unless otherwise provided for in the <br />Minnesota Technical Requirements. <br />Interconnection Agreement The terms and conditions between the Area EPS Operator and <br />Interconnection Customer (Parties). See Section 8 in the Overview Process Error! Reference <br />source not found. for when the Uniform Contract or Interconnection Agreement applies. <br />Interconnection Application <br />or modified, as described in Section 4 of the Overview Process, DER. See Simplified Application <br />Form and Interconnection Application Form. <br />Municipal Minnesota Interconnection Agreement _ January 2019 26 <br /> <br />126 <br />