SCHEDULE 2 - STANDARD CONTRACTS
<br />Distribution Upgrades The additions, modifications, and upgrades to the Distribution System
<br />at or beyond the Point of Common Coupling to facilitate interconnection of the DER and render
<br />the distribution service necessary to affect
<br />Distribution System. Distribution Upgrades do not include Interconnection Facilities.
<br />Electric Power System (EPS) The facilities that deliver electric power to a load.
<br />Fast Track Process The procedure as described in the Interconnection Process - Fast Track
<br />Process for evaluating an Interconnection Application for a DER that meets the eligibility
<br />requirements in the Overview Process Section 2.3.
<br />Force Majeure Event An act of God, labor disturbance, act of the public enemy, war,
<br />insurrection, riot, fire, storm or flood, explosion, breakage or accident to machinery or
<br />equipment, an order, regulation or restriction imposed by governmental, military or lawfully
<br />Event does not include an act of negligence or intentional wrongdoing.
<br />Good Utility Practice Any of the practices, methods and acts engaged in or approved by a
<br />significant portion of the electric industry during the relevant time period, or any of the
<br />practices, methods and act which, in the exercise of reasonable judgment in light of the facts
<br />known at the time the decision was made, could have been expected to accomplish the desired
<br />result at a reasonable cost consistent with good business practices, reliability, safety and
<br />expedition. Good Utility Practice is not intended to be limited to the optimum practice, method,
<br />or act to the exclusion of all others, but rather to be acceptable practices, methods, or acts
<br />generally accepted in the region.
<br />Governmental Authority Any federal, state, local or other governmental regulatory or
<br />administrative agency, court, commission, department, board, or other governmental
<br />subdivision, legislature, rulemaking board, tribunal, or other governmental authority having
<br />jurisdiction over the Parties, their respective facilities, or the respective services they provide,
<br />and exercising or entitled to exercise any administrative, executive, police, or taxing authority
<br />or power; provided, however, that such term does not include the Interconnection Customer,
<br />the Area EPS Operator, or any Affiliate thereof. The local governing body is the
<br />authority governing interconnection requirements unless otherwise provided for in the
<br />Minnesota Technical Requirements.
<br />Interconnection Agreement The terms and conditions between the Area EPS Operator and
<br />Interconnection Customer (Parties). See Section 8 in the Overview Process Error! Reference
<br />source not found. for when the Uniform Contract or Interconnection Agreement applies.
<br />Interconnection Application
<br />or modified, as described in Section 4 of the Overview Process, DER. See Simplified Application
<br />Form and Interconnection Application Form.
<br />Municipal Minnesota Interconnection Agreement _ January 2019 26