My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.1. ERMUSR 12-17-2019
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2019
>
12-17-2019 SPECIAL
>
4.1. ERMUSR 12-17-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2019 3:57:01 PM
Creation date
12/19/2019 3:40:14 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
12/17/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
479
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS <br />Export Capacity Limitation* <br />Is the export capability of the DER limited? Yes No <br />If the DER export capacity is limited, complete the following sections and include information material <br />explaining the limiting capabilities. <br />Maximum Physical Export Capacity Requested: kW <br />ac <br />If Yes, please provide additional details describing method of export limitation: <br />Load Information * <br />-sited Load: kW <br />ac <br />Typical Reactive Load (if known): <br />Equipment Certification * <br />Is the DER equipment certified? Yes No <br />Please list all IEEE 1547 certified equipment below. Include all certified equipment manufacturer <br />specification sheets with the Interconnection Application submission. <br />Equipment Type Certifying Entity <br />1 <br />2 <br />3 <br />4 <br /> <br /> <br /> <br /> <br /> <br />* Indicates section must be completed. <br />ELK RIVER MUNICIPAL UTILITIES 4 <br /> <br />241 <br />
The URL can be used to link to this page
Your browser does not support the video tag.