Laserfiche WebLink
SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS <br />Prime Mover* <br />Please indicate the prime mover: <br />Solar Photovoltaic Microturbine Fuel Cell <br />Reciprocating Engine Gas Turbine Other (please specify) <br />Is the prime mover compatible with certified protection equipment package? Yes No <br />DER Manufacturer: Model Name & Number: Version: <br />List of Adjustable Set Points for Protection Equipment or Software: <br />Summer Name Plate Rating: kW Summer Name Plate Rating: kW <br />acac <br />Winter Name Plate Rating: kVA Winter Name Plate Rating: kVA <br />acac <br />Rated Power Factor: Leading: Lagging: <br />A completed Power System Load Flow data sheet must be supplied with the Interconnection <br />Application. <br /> <br />Only appropriate sections beyond this point until the signature page are to be completed. <br /> <br />Distributed Energy Resource Characteristic Data (for Inverter-based machines) <br />Max design fault contribution current: <br />Is your response to the previous field an Instantaneous or RMS <br /> Instantaneous RMS <br />measurement? <br />Harmonic Characteristics: <br />Start-up Requirements: <br />* Indicates section must be completed. <br />ELK RIVER MUNICIPAL UTILITIES 5 <br /> <br />242 <br />