My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.1. ERMUSR 12-17-2019
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2019
>
12-17-2019 SPECIAL
>
4.1. ERMUSR 12-17-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2019 3:57:01 PM
Creation date
12/19/2019 3:40:14 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
12/17/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
479
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS <br />Application Agent * <br />Is the Customer using an Application Agent for this application? Yes No <br />If Interconnection Customer is not using an Application Agent, please skip to the next section. <br />Application Agent: <br />Company Name: <br />Email: Phone: <br />Distributed Energy Resource Information * <br />Estimated Installation Date: <br />Location (if different from mailing address of Interconnection Customer): <br />Will the Proposed DER system be interconnected to an existing electric service? Yes No <br />Is the Distributed Energy Resource a single generating unit or multiple? Single Multiple <br />DER Type (Check all that apply): <br />Solar Photovoltaic Wind Energy Storage <br />Combined Heat and PowerSolar Thermal Other (please specify) <br /> <br />DER systems with Energy Storage must also submit the Energy Storage Application to the Utility. <br />Total Number of Distributed Energy Resources to be <br /> <br />interconnected pursuant to this Interconnection Application: <br /> Single Phase Three Phase <br />Phase configuration of Distributed Energy Resource(s): <br />Type of Generator: <br />Inverter Synchronous Induction <br />Aggregate DER Capacity (the sum of nameplate capacity of all generation and storage devices at the <br />PCC): <br />kW <br />kVA <br />ac <br />ac <br />* Indicates section must be completed. <br />ELK RIVER MUNICIPAL UTILITIES 3 <br /> <br />240 <br />
The URL can be used to link to this page
Your browser does not support the video tag.