Laserfiche WebLink
SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS <br />General * <br />Select Review Process: Fast Track Process Study Process <br /> New Distribution Energy Capacity Addition or Material Modification <br />Application is for: <br />Resource to Existing Distributed Energy Resource <br />If Capacity Addition or Material Modification to existing facility, please describe: <br />Distributed Energy Resource will be used for what reason? (Check all that apply): <br />Net MeteringSupply Power to Interconnection Customer <br />Supply Power to Area EPS <br /> <br />Installed DER System Cost (before incentives):$ <br />Interconnection Customer * <br />Full Name (must match the name of the existing service account): <br />Account Number: Meter Number: <br />Mailing Address: <br />City: State: Zip Code: <br />Email: Phone: <br />* Indicates section must be completed. <br />ELK RIVER MUNICIPAL UTILITIES 2 <br /> <br />239 <br />