My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.1. ERMUSR 12-17-2019
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2019
>
12-17-2019 SPECIAL
>
4.1. ERMUSR 12-17-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2019 3:57:01 PM
Creation date
12/19/2019 3:40:14 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
12/17/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
479
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS <br />General * <br />Select Review Process: Fast Track Process Study Process <br /> New Distribution Energy Capacity Addition or Material Modification <br />Application is for: <br />Resource to Existing Distributed Energy Resource <br />If Capacity Addition or Material Modification to existing facility, please describe: <br />Distributed Energy Resource will be used for what reason? (Check all that apply): <br />Net MeteringSupply Power to Interconnection Customer <br />Supply Power to Area EPS <br /> <br />Installed DER System Cost (before incentives):$ <br />Interconnection Customer * <br />Full Name (must match the name of the existing service account): <br />Account Number: Meter Number: <br />Mailing Address: <br />City: State: Zip Code: <br />Email: Phone: <br />* Indicates section must be completed. <br />ELK RIVER MUNICIPAL UTILITIES 2 <br /> <br />239 <br />
The URL can be used to link to this page
Your browser does not support the video tag.