My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.1. ERMUSR 12-17-2019
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2019
>
12-17-2019 SPECIAL
>
4.1. ERMUSR 12-17-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2019 3:57:01 PM
Creation date
12/19/2019 3:40:14 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
12/17/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
479
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS <br />Interconnection Application <br />Persons interested in applying for the <br />distribution system through the Fast Track or Study Processes are to fill out this Interconnection <br />Application. The Interconnection Application is to be filled out completely by the applicant or as noted <br />in each section of the application. The Utility will contact the applicant within 10 business days once the <br />Interconnection Application and the corresponding processing fee is submitted to the Utility. The Utility <br />will then notify the applicant of the completeness of their application. If the application is deemed <br />incomplete by the Utility, the Utility will provide the applicant with a list of missing material. The <br />applicant will then have 10 business days to provide the Utility with this information or request an <br />extension, otherwise the application will be deemed incomplete and the applicant will lose their place in <br />the queue. Section that are noted with * are required to be filled out. <br />Checklist for Submission to Utility <br />The items below shall be included with submittal of the Interconnection Application to the Utility. <br />Failure to include all items will deem the Interconnection Application incomplete. <br />Included <br />Non-Refundable Processing Fee <br />Fast Track <br />$100 + $1/kW for Certified Systems <br /> Yes <br />$100 + $2/kW for Non-Certified Systems <br />Study Process <br />$1,000 + $2/kW down payment. Additional study fees may apply. <br />One-line diagram <br />This one-line diagram must be signed and stamped by a Professional <br />Engineer licensed in Minnesota if the DER is uncertified greater than 20 kW <br /> Yes <br />AC or if certified system is over 250 kW. <br />Details required on one-line diagram specified at the end of the <br />interconnection application. <br />Schematic drawings for all protection and control circuits, relay current circuits, <br /> Yes <br />relay potential circuits, and alarm/monitoring circuits <br />Inverter Specification Sheet(s) (if applicable) Yes <br />Documentation that describes and details the operation of protection and control <br /> Yes <br />schemes <br />Documentation showing site control Yes <br />Aerial map showing DER system layout including major roadways and true north Yes <br />Possible Additional Documentation <br />If the DER export capacity is limited, include information material explaining the limiting <br />capabilities. <br />If Energy Storage is included with the proposed DER system include the Energy Storage <br />Application. <br />ELK RIVER MUNICIPAL UTILITIES 1 <br /> <br />238 <br />