My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.1. ERMUSR 12-17-2019
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2019
>
12-17-2019 SPECIAL
>
4.1. ERMUSR 12-17-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2019 3:57:01 PM
Creation date
12/19/2019 3:40:14 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
12/17/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
479
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS <br />Electric Distribution System Information - Continued <br />Info Not <br /> <br />Available <br /> <br />Approximate circuit distance between the proposed PCC and the <br /> Miles <br />substation: <br /> <br />Distance to three phase circuit (if not already located on a three-phase <br /> Miles <br />circuit): <br /> <br /> Amps <br />Limiting conductor ratings from the proposed PCC to the substation <br /> <br /> Phases <br />Number of available phases on the area EPS at the proposed PCC <br />Is the proposed point of common coupling located on a spot network, <br /> <br /> Yes No <br />grid network, or radial supply? <br /> <br />Is the proposed PCC located behind a line voltage regulator? Yes No <br /> <br />Type of voltage regulating devices between substation and proposed <br />Device <br /> <br />A <br />PCC <br /> <br />Device <br /> <br />B <br /> <br />Device <br /> <br />C <br /> <br />Number and type of protection devices between substation and Device <br /> <br />A <br />proposed PCC <br /> <br />Device <br /> <br />B <br /> <br />Device <br /> <br />C <br /> <br />Any additionally known distribution system constraints? Yes No <br />Additional known constraints that could affect installation or operation of the DER or Area EPS at the <br />proposed PPC are attached to this report. Constraints may include, but are not limited to, electrical <br />dependencies at that location, short circuit interrupting capacity issues, power quality or stability issues <br />on the circuit, capacity constraints, or secondary networks. <br />Utility Information <br />Report Completed By: <br />Company: <br /> <br />Project Contact: <br /> <br /> <br />Email: Phone: <br />ELK RIVER MUNICIPAL UTILITIES 2 <br /> <br />232 <br />
The URL can be used to link to this page
Your browser does not support the video tag.