My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.1. ERMUSR 12-17-2019
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2019
>
12-17-2019 SPECIAL
>
4.1. ERMUSR 12-17-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2019 3:57:01 PM
Creation date
12/19/2019 3:40:14 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
12/17/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
479
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS <br />Pre-Application Report <br />This report summarizes information available to the Utility regarding an interconnection of a distributed <br />The report includes only information that is readily <br />available to the Utility. This report is not a guarantee by the Utility that a future interconnection <br />application will be approved for the proposed site. Information provided in this report is subjected to <br />change as modifications are made to <br />Pre-Application Request <br />Pre-Application ID: <br />Project Address: <br /> <br />DER Size: kW AC DER Type: <br /> <br />Project Contact: <br /> <br /> <br />Email: Phone: <br />Electric Distribution System Information <br />Info Not <br /> <br />Available <br /> <br />Total capacity of the circuit based on normal conditions likely to <br /> <br />MW AC <br />serve the proposed PCC <br /> <br />Existing aggregate generation capacity interconnected to the <br /> <br />MW AC <br />circuit likely to serve the proposed PCC <br /> <br />Aggregate queued generation capacity for the circuit likely to <br /> <br />MW AC <br />serve the proposed PCC <br /> <br />Available capacity of the circuit most likely to serve the proposed <br /> <br />MW AC <br />PCC <br /> <br /> <br />Estimated peak load of relevant line sections kW AC <br /> <br />Estimated minimum load of relevant line sections (daytime <br /> <br />kW AC <br />minimum load to be specified for solar DER if available.) <br /> <br /> <br />Substation Voltage (Nominal Distribution) kV <br /> <br /> <br />Substation Voltage (Nominal Transmission) kV <br /> <br /> <br />Nominal distribution circuit voltage at proposed PCC kV <br /> <br />t//ʹ tƚźƓƷ ƚŅ /ƚƒƒƚƓ /ƚǒƦƌźƓŭ <br />ELK RIVER MUNICIPAL UTILITIES 1 <br /> <br />231 <br />
The URL can be used to link to this page
Your browser does not support the video tag.